Laserfiche WebLink
2.7 Warranty Service <br /> During the period of warranty, the Contractor is expected to make all communications between <br /> manufacturer,installing contractor and the City Traffic Engineering Division regarding any warranty <br /> service. Contractor shall notify the City Traffic Engineering Division of any undue delays in <br /> response by the manufacturer or installing Contractor and details of each incident. <br /> 2.8 Electronic Record System <br /> The contractor shall supply and make operational a Windows-based computerized maintenance and <br /> inventory management system accessible by the City and Contractor via the Internet that at a <br /> minimum shall provide the following features: <br /> Intersections—A complete database of signalized intersections including all routine maintenance <br /> histories, complete equipment inventory, electronic photo images, repair history <br /> and installation date of all equipment utilized at each location. <br /> Assets— Asset inventory, maintenance/repair history and real-time available inventoried <br /> replacement parts, current status of reordered equipment and inventory tracking. <br /> Preventative/Emergency Maintenance—A record of all calls,date and time stamp of:moment of <br /> receipt, dispatch, contractor arrival and departure. All records shall have <br /> description of problem and repair made. All records shall be updated in real time <br /> by the contractor via PDA or similar device and made available to City for real- <br /> time monitor of call status via the internet. <br /> The maintenance and inventory management system shall incorporate a bar-code system for tracking <br /> equipment and activity. The contractor shall ensure that all new and replacement equipment has bar- <br /> code labels attached. The Contractor shall add new bar-code labels to all equipment that is currently <br /> unlabeled as part of preventative maintenance. At a minimum, the following traffic signal <br /> equipment shall be included in the bar-code system: Traffic Controller Cabinet, traffic signal <br /> controller, MMU, BIU,TS2 Cabinet power supply,video detection equipment detector amplifiers, <br /> CCTV cameras,communications equipment and battery backup systems. All records shall be made <br /> available to City for real-time monitor/ lookup of data via the internet. <br /> The Electronic Record Management system shall be fully operational within 60 days of award of <br /> contract. The City, at its option, may request minor revisions or changes to the system. These <br /> changes will be at no cost to the City. Upon completion of the contract, the City, at its option, may <br /> retain possession of the database for future use related to the City's traffic signal maintenance <br /> management inventory. This option shall be at no cost to the City. <br /> Traffic Signal Maintenance Contract Contract No. <br /> Attachment 3—Scope of Work Page 5 <br />