My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENT 1-4; 6-9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
041613
>
18 ATTACHMENT 1-4; 6-9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2015 3:03:53 PM
Creation date
4/10/2013 3:42:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/16/2013
DESTRUCT DATE
15Y
DOCUMENT NO
18 ATTACHMENT 1,4,6,9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
applicant desires to provide more adult-themed activities in this open space area such as wine <br /> tastings, and because a tot lot with play equipment would be provided a short walk away. <br /> Regarding private open space, the Standards do not require private open space be provided for <br /> each unit. Two-hundred ninety seven (297) of the 305 units would have private open space <br /> areas in the form of patios or balconies. The private open space areas range from 50 to 188 sq. <br /> ft. in area. The eight units without private open space are located at the northern corner of the <br /> podium building's central open space (two Unit Type P-2b per floor). The applicant removed <br /> the patios/balconies at those locations in order to maximize the opening between the central <br /> open space and the courtyard to its north. <br /> Overall, staff finds the project amenities and group and private open space to be acceptable. <br /> Traffic and Circulation <br /> Vehicular access to the apartments would be provided from the two existing Owens Drive <br /> driveways: the western driveway would be narrowed by approximately 22 feet to accommodate <br /> one 16-foot entry lane and one 12-foot exit lane; and the eastern driveway is proposed to be <br /> widened by approximately six feet to accommodate one 14-foot wide entry lane and two 11-foot <br /> wide exit lanes. The existing Owens Drive median break for the western driveway would <br /> remain and a new median break would be installed for the eastern driveway. Two drive aisles <br /> from the apartment site would connect to the existing office parking lots, making it possible for <br /> the apartment residents to access the property through the office parking lots (and vise versa). <br /> Two new driveways would be installed to serve the retail buildings: one on Rosewood Drive <br /> and one on Owens Drive. <br /> The Pleasanton General Plan requires site-specific traffic studies for all major developments <br /> which have the potential to exceed Level of Service (LOS) D at major intersections and requires <br /> developers to implement the mitigation measures identified in these studies in order to maintain <br /> LOS D or better. Exceptions are made for the Downtown and "Gateway Intersections" where <br /> the LOS D or better standard may be exceeded. A traffic study was prepared by Fehr and Peers, <br /> acting as the City's traffic consultant, to analyze the traffic and circulation for this project. <br /> The traffic study analyzed the near-term and cumulative/long-term traffic scenarios with and <br /> without the project. The near-term scenario includes the existing traffic plus anticipated traffic <br /> from approved but not yet built projects. The cumulative/long-term (or build-out) scenario <br /> consists of development that has not received final plan approval from the City but has been <br /> identified to be completed in the long term with the build out of the Pleasanton General Plan. <br /> Regional traffic growth is also considered in the cumulative/long-term scenario. Ten <br /> intersections were analyzed in the traffic study as they provide access to the project site and are <br /> likely to be affected by the project based on the number of trips that the project adds to the <br /> intersections. <br /> P UD-85-08-1 D-4M Page - 14 - March 27, 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.