Laserfiche WebLink
P11-0824(Downtown Hospitality Guidelines), P12-0798(Pleasanton Municipal Code Amendments) <br /> Initial Study and Negative Declaration <br /> 5.17. UTILITIES AND SERVICE SYSTEMS <br /> ENVIRONMENTAL SETTING <br /> No construction or demolition is proposed as part of the project. <br /> Special events and hospitality uses, such as music, entertainment, and bars are already <br /> allowed Downtown. The underlying zoning map establishing where these uses may be <br /> located is not proposed to change. Increases in occupancy above Code, such as the Fire <br /> Code, are not proposed. These types of events and commercial land uses were <br /> addressed in the Pleasanton General Plan and its corresponding EIR. <br /> STANDARDS OF SIGNIFICANCE <br /> For purposes of this environmental document, an impact is considered significant if the <br /> proposed project would: <br /> • Result in the construction of new water facilities or expansion of existing facilities; <br /> • Result in exceeding the wastewater treatment requirements of the Regional Water <br /> Quality Control Board; <br /> • Result in or require the construction or expansion of existing wastewater treatment <br /> facilities; <br /> • Be served by a landfill that has inadequate permitted capacity. <br /> Less Than <br /> Significant <br /> Potentially Impactwfih Less Than <br /> Significant Mitigation Significant No <br /> Issues Impact Incorporated 'mead Impact <br /> Utilities and Service Systems <br /> Would the project <br /> a) Exceed wastewater treatment requirements of the I X 1 <br /> applicable Regional Water Quality Control Board? 1 <br /> b) Require or result in the construction of new water or <br /> X I <br /> wastewater treatment facilities or expansion of existing <br /> facilities, the construction of which could cause significant <br /> environmental effects? <br /> c) Require or result in the construction of new storm water E <br /> drainage facilities or expansion of existing facilities, the <br /> construction of which could cause significant <br /> environmental effects? <br /> d) Have sufficient water supplies available to serve the <br /> l E X I I <br /> project from existing entitlements and resources, or are <br /> new or expanded entitlements needed? <br /> 53 <br /> November 2,2012 <br />