My WebLink
|
Help
|
About
|
Sign Out
02 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
112712 Special Meeting
>
02 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2012 11:48:18 AM
Creation date
11/19/2012 11:47:24 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/27/2012
DESTRUCT DATE
15Y
DOCUMENT NO
02 ATTACHMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P11-0824(Downtown Hospitality Guidelines),P12-0798(Pleasanton Municipal Code Amendments) <br /> Initial Study and Negative Declaration <br /> 5.14. PUBLIC SERVICES <br /> ENVIRONMENTAL SETTING <br /> The City of Pleasanton has public services and infrastructure planned to meet existing and <br /> future growth as planned in the Pleasanton General Plan. <br /> STANDARDS OF SIGNIFICANCE <br /> For purposes of this environmental document, an impact is considered significant if the <br /> proposed project would: <br /> • Create an increase in demand for police protection services which could <br /> substantially interfere with the ability of the Police Department to provide adequate <br /> response time to the project site; <br /> • Create an increased demand for fire protection services that would substantially <br /> interfere with the ability of the Fire Department to provide adequate response time <br /> to the project site; <br /> • Crease an increased demand for schools that would exceed existing school <br /> capacity; or, <br /> • Create an increased demand for parks and other public facilities that would exceed <br /> existing capacity. <br /> Less Than <br /> Significant <br /> Potentially Impact With Loss Than <br /> Significant Mitigation Significant No <br /> Issues Impact incorporated impact impact <br /> Public Services <br /> Would the project <br /> a) Would the project result in substantial adverse physical <br /> impacts associated with the provision of new or physically <br /> altered governmental facilities, need for new or physically <br /> altered governmental facilities, the construction of which <br /> could cause significant environmental impacts, in order to <br /> maintain acceptable service ratios, response times or <br /> other performance objectives for any of the public <br /> services: <br /> i) Fire protection? Q © <br /> ii) Police protection? E © 0 <br /> iii) Schools? Q El © Q <br /> November 2,2012 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.