Laserfiche WebLink
Irrigation and Landscaping Improvements at El Charro Road and the I-580 Interchange (UP 115023) <br /> July 31, 2012 <br /> Page 2 <br /> Meet with City Staff to identify preferred direction. <br /> Subtask 1.3 - City Staff Revise plans based on Staff comments. Prepared exhibits and present <br /> Review plans to Staff for review. <br /> Subtask 1.4- Caltrans Coordinate with Cakrans as necessary: <br /> Processing • Review and submit plans to Caltrans for 65% and Final review. <br /> Meet with Caltrans Staff to review comments <br /> • Review with Staff current maintenance agreements,prepare <br /> maintenance agreement graphics for El Charro/I-580 <br /> • Caltrans shall prepare final maintenance agreement. <br /> • Acquire approved encroachment permit <br /> Subtask 1.5- Utility • Contact utility companies and collect"record" utility information <br /> Coordination • Review existing PG&E,DSRSD,utilities and easements <br /> PRODUC1S: <br /> Work Plan and Schedule <br /> Monthly Project Update <br /> Concept Plans Preliminary Materials Palette for Staff(3 sets) <br /> Design Review Package <br /> Utility Connectors Summary <br /> MEETINGS: <br /> City Staff 2 <br /> Caltrans 2 <br /> Design Review 1 <br /> TASK 2 — Prepare a construction document in Caltrans 2010 format that will illustrate the <br /> DETAILED DESIGN plant material selection, hardscape features, irrigation plan, materials selection, <br /> quantities and details. Irrigation, details and spedfacatlons shall be City of <br /> Pleasanton standard <br /> Subtask 2.1 - 65% Based on City comments,65% drawings including: <br /> PS&F • Planting Plan and Details <br /> • Irrigation Plan and Details <br /> • Temporary Water Pollution Control Quantities Plan(2 sheets-plan <br /> and detail) <br /> • Construction Area Signs Plan(1 sheet) <br /> • Prepare itemized cost estimate in Caltrans BEES format <br /> • Identify possible value engineering items <br /> • Update Bay-Friendly Checklist <br /> Subtask 2.2 - Review Meet with City Staff to review 65% plans and discuss any design <br /> refinements. <br />