My WebLink
|
Help
|
About
|
Sign Out
ORD 0975
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
0901 - 1000
>
ORD 0975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2004 12:26:50 PM
Creation date
3/23/1999 4:54:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 0975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
68. That the developer provide for the design, construction <br /> and installation of the improvements discussed below if <br /> and when required by the City Engineer in writing. The- <br /> intent of this condition is to effect a reasonable level <br /> of safe vehicular access from Hopyard Road .to the Arroyo <br /> del Valle at such time as the Arroyo del Valle bridge <br /> and Valley Avenue from the bridge to Bernal Avenue is <br /> installed. <br /> <br /> A. .ValleyAvenue:' Hopyard 'Ro'ad to"Hansen ~rive <br /> This section of Valley Avenue'iS currently ~eing <br /> constructed by Ponderosa and will consist of one <br /> full traffic lane in each direction as :an - <br /> interim condition and two full lanes i~ e'ach <br /> direction, divided, in the future.' No addi-' <br /> riohal work is required here if the traffic <br /> volume does not exceed the capacity of the <br /> one-half street configuration. If the Fromm <br /> development precedes the Mackay development <br /> of Tract 4385, it would be necessary for Fromm <br /> to provide a temporary transition for south- <br /> bound traffic on the north side of the inter- <br /> section of Valley Avenue and Hartsen Drive. <br /> <br /> B. Valley Avenue:'Hansen Drive 'to"Paseo 'San'ta Cruz <br /> This section of Valley Avenue consists of two- <br /> -way traffic on the existing 18-1/2 ft. wide <br /> pavement on the east side of Valley.Avenue <br /> with traffic in direct opposition at the <br /> southerly terminus. If Mackay Homes develops <br /> Tract 4385 prior to the start of the Fromm pro- <br /> ject, they will construct the street frontage <br /> improvements on the west side of Valley Avenue <br /> necessary to effect a safe traffic circulation <br /> and no work would be required from Fromm. In <br /> the event that the Fromm project precedes Mackay, <br /> it will be necessary for Fromm to do the required <br /> improvements with possible reimbursement from <br /> Mackay. <br /> <br /> C. Valley Avenue: Pase~ 'Sant~ Cr~z"t'~. ~r'r'oyo' de'l' Valle <br /> This section consists of separated roadway. Eighteen <br /> and one-half feet (18-1/2 ft.) of paving exists <br /> on each side and will provide 'one full lane in <br /> each direction. <br /> <br />III - <br /> <br /> -12- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.