Laserfiche WebLink
No work from Fromm is anticipated here. The <br /> additional paving to provide for two lanes in <br /> each direction, the future median is'land and <br /> landscaping, and the landscaping and bike path <br /> on the west side of Valley are future City <br /> obligations. <br /> <br />69. That the project be designed to provide sufficient <br /> space for adding a second northbound'freeway on-ramp <br /> and right-turn approach lane along the northside of <br /> Bernal Avenue if required. <br /> <br />70. That the design for Valley Avenue include provisions for <br /> accessing fairground parking traffic and minimize the <br /> number of breaks in the Valley Avenue median, and <br /> · that the design for Valley Avenue include provisions <br /> for the intersection of Valley Avenue with the future <br /> ~enSion of Rose Avenue and that these be considera- <br /> -~ons ~ 9~ ..~he final design. <br /> <br />71. T~at"all existing wells, septic tanks or holding <br /> tanks on the site be properly sealed, filled and <br /> abandoned prior to or in conjunction with the <br /> start of grading operations unless Zone 7 retains <br /> specific wells for observation wells, or special <br /> approval is obtained from the City Engineer for <br /> temporary use of an existing well for construction <br /> water. <br /> <br /> 72. That the developer submit an erosion and sedimentation <br /> control plan as part of the improvement plans prior <br /> to approval of the final map for the subdivision of. <br /> the first unit of the subject property and that said <br /> plan shall make provision for the control of erosion <br /> throughout all phases of development of the property. <br /> <br /> 73. That approval of the water supply and distribution <br /> system be withheld pending final design and until <br /> the developer has demonstrated to the satisfaction <br /> of the City Engineer that the proposed system meets <br /> both the immediate and long range requirements <br /> for supplying water in this area. <br /> <br /> 74. That approval of the storm drainage system be withheld <br /> pending final design and until the developer has <br /> demonstrated to the satisfaction of the City Engineer <br /> that the system is adequate, connects to an approved <br /> point of discharge, .meets any and all applicable <br /> requirements of the Alameda Flood Control District, <br /> meets any and'all applicable requirements of the <br /> <br /> /// <br /> <br /> <br />