My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
032012
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2012 3:10:18 PM
Creation date
3/13/2012 3:10:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/20/2012
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M&S Job#19639.010 <br /> Exhibit A <br /> Page 5 of 9 <br /> accordance with Caltrans design standards,California MUTCD guidelines,and the City's current <br /> design standards. <br /> .• Final geotechnical recommendations including grading recommendations, pavement sections, <br /> ground water elevations, and soils properties for the design of signal bases. <br /> S Preliminary fencing plan, planting plans with plant schedules, installation details and irrigation water <br /> budgets (to show compliance with the Water Efficient Landscape Ordinance). <br /> + Illustrative landscape exhibits for the southwestern corner of the intersection showing the impacted <br /> entry to the Hacienda Business Park and proposed modifications.After approval by the City,this <br /> exhibit is anticipated to be presented within a specific coordination meeting with Hacienda Business <br /> Park to obtain their input. <br /> + Separate joint trench and utility relocation drawings including utility design and review <br /> requirements with preliminary relocation or extension configurations including coordination with <br /> PG&E,Telephone, CAN, and the design team. <br /> • Street Lighting Plans and Photometric Study including conduit size and routing, conductor size and <br /> quantities, and pull box locations. <br /> • Plats and legal descriptions of rights-of-way to be acquired based on title reports provided by the <br /> City. <br /> • Consultant will assist City staff in the analysis of the existing Sutter Gate intersection to address an <br /> sight visibility issues. <br /> .• Preliminary construction cost estimates from all disciplines. <br /> Deliverables: 50%Plans and an updated Cost Estimate, Preliminary Water Quality Plan, Final <br /> Geotechnical Recommendations, Illustrative Landscape Exhibits, Plats& Legal Descriptions for right-of- <br /> way acquisition. <br /> 2.2 Design Submittal—100%Level—Plans, Specifications and Estimates <br /> Based on the approval of the 50%design plans, incorporate City and stakeholder design comments and <br /> develop the design PS&E documents including at a minimum: <br /> • 100%design construction documents for: <br /> • Street and Drainage improvement plans <br /> • Signing and Striping Plans <br /> • Joint trench Utility relocation drawings <br /> • Detailed Traffic Signal designs <br /> • Landscape and Irrigation Plans including all associated installation details <br /> • Street Lighting <br /> • Special Specifications(not included in the City's Standard Specification)and Updated Project <br /> Estimates from all disciplines. <br /> • Draft Water Quality Report <br /> Deliverables: 100%Plans, Specifications, and an updated Cost Estimate. Draft Water Quality Report. <br /> P:\19639\office\contracts\2012-03-02_M acKay&So m ps_Exh i bit-A.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.