Laserfiche WebLink
M&S Job,*19639.010 <br /> Exhibit A <br /> Page 2 of 9 <br /> Miscellaneous coordination with the City,stakeholders(the City of Pleasanton, DSRSD, Kinder Morgan, <br /> PG&E,AT&T(Telephone),Zone 7,Comcast,AT&T, LAVTA,and the Hacienda Business Park), USA <br /> markings, potholing contractor and project team. <br /> 0.3 Project Administration <br /> Administrative tasks related to contractual agreements, insurance and compensation of sub-consultants. <br /> TASK 1—PRELIMINARY DESIGN SERVICES <br /> 1.1 Project Kick-Off Meeting <br /> Coordinate and hold a project"kick-off' meeting with City Staff and the Consultant team to develop the <br /> design intent of the conceptual aspects of the project and to establish overall project goals, objectives <br /> and timelines.This meeting will also be used to facilitate cross-communication and begin value <br /> engineering discussions. <br /> 1.2 Land Surveying <br /> Review existing record information for the Project site and establish site survey control (including field <br /> survey of found site control, monuments,etc.) <br /> Obtain supplemental field topographic information to locate visible features(precise top of curb grades, <br /> utility inverts,valve and manhole locations and rim grades, precise tree locations, etc.) not previously <br /> obtained by the City's on-call surveyor as required for design effort and as required to conform <br /> improvements to existing features. <br /> Potholing—Pothole existing underground utilities(Kinder Morgan High Pressure Gas Line and Existing <br /> Joint Trench Facilities) including field survey of exposed utilities to tie-out horizontal and vertical <br /> locations(includes sub-consultant work by potholing contractor). Potholing will occur at locations where <br /> existing improvements could have a potential conflict with proposed improvements. <br /> 1.3 Design Base <br /> Review record maps, plans and construction documents(as provided by City and other sources). Prepare <br /> electronic base map utilizing the City provided topographic information as well as supplemental survey <br /> control and field surveys to provide an accurate depiction of Project site limits. Design base will define <br /> existing property lines sufficient to provide an approximate delineation of right-of-way acquisition <br /> required and to allow for the preparation of draft plats and legal descriptions. <br /> 1.4 Geotechnical Studies <br /> 1.4.1 Geotechnical Investigation:Consultant will provide a geotechnical investigation report for the <br /> proposed intersection improvements including: <br /> • Review pertinent published literature and map and reports in our files; <br /> • Obtain a Zone 7 Water Agency Drilling Permit; <br /> • Obtain an encroachment permit from the City of Pleasanton (we assume no charge since <br /> this is a City project); <br /> •• Mark the boring and core locations and contact USA; <br /> • Provide traffic control during the field investigation; <br /> • Utilize an underground locating subcontractor to clear boring and coring locations; <br /> • Drill and log 3 borings with hollow stem augers on a truck mounted drill rig; <br /> • One boring will be up to 30 feet deep and include groundwater information; <br /> P:\19639\office\contracts\2012-03-02_M ac Kay&So m ps_Exh i bit-A.doc <br />