Laserfiche WebLink
4.Written Comments on the Draft EIR and Responses to Comments <br /> Letter 5. E&S Ring Management Corporation <br /> (Ken Busch, Project Manager) <br /> 5-1 The comment notes an inconsistency between Table 3-3 which shows residential <br /> development on Site at 345-460 units and Table 5.1 which shows the project at 159 units. <br /> Table 5.1 reflects the correct number(159 residential units)which was the basis for the <br /> traffic analysis prepared by Fehr and Peers. Additionally, the Alternative 4 analyzed <br /> 212 residential units on Site 8,as shown in the updated land use assumptions used by <br /> Fehr and Peers. Therefore,Table 3-3 should be corrected to show the range of units for <br /> Site 8 as 159-345. <br /> The lb!lowing edit has been made to Table 3-3, row 8, on page 3-14 of the Draft SELR: <br /> TABLE 3-3 <br /> POTENTIAL SITES FOR REZONING <br /> No. <br /> Potential Units at No. <br /> Acreage for 23 Units at <br /> Existing General Plan MF units/a 30+ <br /> # Property APN Designation Acres Development c units/ac <br /> Retail/Highway/Service 345460 <br /> Auf de Maur/ Commercial, Business& <br /> 8 Richenback 9464542.045-03 Prof.Offices 16.0 11.5 159-345 <br /> 5-2 The comment requested clarification on the trip generation estimates used to determine <br /> project impacts related to Site 8, as the land uses outlined in the Draft SEIR do not reflect <br /> the proposed development correctly. The comment is correct that the transportation <br /> analysis did not use the same land use assumption that were described in the Draft <br /> Housing Element dated August, 2011. The land use assumptions for the site under the <br /> Draft SEIR reflect the best available information at the time of the analysis. Table 4-1 <br /> presents the land use summary available at the time of the transportation analysis. <br /> TABLE 4-1 <br /> LAND USE SUMMARY FOR SITE 8 <br /> Scenario Commercial Multi-Family Units <br /> No Project(Current Zoning) 210,000 sqft --- <br /> Housing Element Project(March 2011) 163,000 159 <br /> Alternatives 1-3 68,600 345 <br /> Alternative 4 163,000 212 <br /> Housing Element August 2011 40,000 345 <br /> SOURCE:Pleasanton Housing Element.Fehr and Peers.E&S Management Corporation,2011 <br /> General Plan Amendment and Rezonings 4-18 ESA/210016 <br /> Final Supplemental Environmental Impact Report December 2011 <br />