My WebLink
|
Help
|
About
|
Sign Out
RES 12493
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2012
>
RES 12493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2012 3:16:41 PM
Creation date
1/13/2012 2:58:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/4/2012
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 12493
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comment Letter 5 <br /> Janice Stem <br /> November 11,2011 <br /> Page 2 <br /> than the 345 units and 40,000 sf neighborhood-serving retail that we have actually proposed for our T5-2 <br /> development of Site 8. cont. <br /> In order to assure the most accurate and informative Final SEIR,we respectfully request that you have <br /> the City's transportation consultant Fehr&Peers prepare an updated technical memo, for inclusion <br /> within the final Transportation Analysis,that: (i)clarifies the use and trip generation assumptions for <br /> Site 8; (ii)clarifies that the trip generation for Site 8 based on the scenario of 159 units and 163,000 sf <br /> retail is greater than the trip generation for Site 8 based on the correct Project Description and our 5-3 <br /> proposed development of Site 8 with 345 units and 40,000 sf retail; and(iii) establishes that such <br /> clarifications do not result in any new or increased transportation impacts not analyzed in the DSEIR. <br /> In addition, the consultant should make the technical correction to the appropriate tables in its <br /> Transportation Analysis to reflect, with respect to Site 8, both the correct Project Description and <br /> Alternative 4, Increased Density. _ <br /> Thank you for your consideration of these comments. If there are any questions I can be reached at <br /> 650-377-5805 or kbusch a,srgnc.com <br /> Sincerely, <br /> f <br /> Ken Busch <br /> Project Manager <br /> E and S Ring Site 8 <br /> cc: Brian Dolan—Planning Director <br /> John Pringle—E&S Ring <br />
The URL can be used to link to this page
Your browser does not support the video tag.