Laserfiche WebLink
Exhibit B <br /> TABLE 6-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> A.Aesthetics <br /> Mitigation Measure 4.141:The City shall require that site plans 7 I Project applicant will prepare City of Pleasanton Verify inclusion of view Prior to PUD Verified by <br /> • <br /> for the proposed Site 7 residential development to incorporate I PUD plans that adhere to all City Coot corridors from Valley approval. <br /> • <br /> view ccnidors through the site which maintain views of the I specifications in this Avenue across site to the <br /> ridgelines to the west from Valley Avenue. I i measure. ridgelinee to the west on the Date: <br /> I site plans. <br /> • <br /> B.Air Duality <br /> Mitigation Measure 4.61:Prior to the issuance of a grading or All Project applicant shall hire Community Approve air quality Prior to issuance Venfred by: <br /> building permit whichever is sooner.the project applicant for a an air quality consultant Development consultant selection. of grading or <br /> potential site for rezoning shall stmt an air quality construction approved by the City of Department Review verification from air building permit. <br /> plan detailing the proposed air quality construction measures Pleasanton who will prepare quality consultant.Verify whichever is Date: <br /> related to the project such as construction phasing,construction a Construction Air Pollutant inclusion of dust control sooner,inspect • <br /> equipment,and dust control measures,and such plan shall be Control Plan that adheres to measures in applicable during <br /> approved by the Director of Community Development.Air quality all specifications in this construction plans and construction. <br /> construction measures shall include Basic Constriction measure and will verity in specifications',field <br /> Mitigation Measures(BAADMD,May 2011)and,where writing that the plan adheres inspections during <br /> construction-related emissions would exceed the applicable to all of BAAOMD's air construction. <br /> thresholds,Additional Construction Mitigation Measures ! quality guidance which is <br /> (BAAOMD.May 2011)shall be instituted.The air quality applicable to the prated. <br /> construction plan shall be included on all grading,utility, <br /> building,landscaping,and improvement plans during all phases <br /> of construction,access roads,parking areas and staging areas <br /> at construction sites. _ <br /> Mitigation Measure 4.164:Reduce Exposure to TACa.On All Project applicant will hire a Community Community Development Community Verified by: <br /> project sites where screening thresholds are exceeded,the qualified air quality consult Development Dept-Review and approve Development <br /> following measures shall be implemented for development on all to prepare a HRA. Department TAC reduction measures. Department- <br /> Me potential sites for rezoning to reduce exposure to TACs and Community Development Approve Date: <br /> improve indoor and outdoor air quality: Department-Review and consultant <br /> Project applicant will approve selection of air selection prior to <br /> Indoor Air Quality-In measures ice with the recommendations ito o/ prepare plans that adhere to quality consultant.Verify PUD approval. <br /> BAAOMD,appropoate measu shall be incorporated into all spedfications In MM inclusion of the approved Verity inclusion of <br /> building design In rimer to reduce the potential M1eaIM risk due to measure. TAC reduction measures in approved <br /> exposure of sensitive receptors to TAGS. i the construction plans. measures poor to <br /> Proj ect applicants shall retain a qualified air quality consultant to j Verify implementation prior the Issuance of trepans health asaccordance risk assessment(HRA)in accordance with the to occupancy. building permits. <br /> e Inspect site <br /> BAADMD requirements to determine the exposure of project during <br /> reabenWoccupants/users to air pollutants prior to PUD construction to <br /> approval.The HRA shall be submitted to the Community � ensure <br /> Conn'Plan Am dmenl and Ramming. 6-3 ESA/21001G <br /> eel supgwnenrl Enimmmmwul Open Riper Decreer 2011 <br />