Laserfiche WebLink
6 M ligation abnitonng and Reporting Program <br /> TABLE 6-1(Continued) <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Site(e) implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> Development Department for review and approval.The applicant i compliance with <br /> shall implement the approved HRA mitigation measure project <br /> recommendations,if any,in order to reduce exposure to TACs constructon <br /> below BAADMDS threshold of significance at the time of project plans. <br /> approval.Housing units shall not be sited in any incompatible <br /> areas,such as if the HRA finds TAO exposure that cannot be City Council- <br /> reduced to less than significant,or if required mitigation cannot Prior <br /> be feasibly implemented. approval <br /> . <br /> Outdoor Air Quality-To the maximum extent practicable, <br /> individual and common exterior open space,including <br /> playgrounds,patios,and decks,shall either be shielded from the <br /> source of air pollution by buildings or otherwise buffered to <br /> further reduce air pollution for project occupants. <br /> Mitigation Measure 4.13-5c If odor complaints associated with 6,8,11,141 if odor complaints received Community TraCk odor complaints. Ongoing until Verified by: <br /> the solid waste transfer station operations are received from 1 from sites 6,8.11 or 14.the Development transfer station is <br /> tuture residences of the potential sites for rezoning(Sites 6.8, I City will work with the Department If applicable,coordinate relocated. <br /> 11,and 14).the City shall work with the transfer station owner(s) 'transfer station owner(s)and with the owner(s)and <br /> and operator(s)to ensure that odors are minimized operator(s)to redu odors operator(s)to reduce odors. Dare: <br /> ce <br /> appropriately. appropriatey. ',. <br /> C.Biological Resources <br /> Mitigation Measure 4,0-Is:Pre-construction Breeding Bird 1-4, The project applicant will 'Community Review and approve a No more than 14 i Verified by: <br /> Surveys.The City shall ensure that prior to development of all prepare construction plans Development qualified biologist. days before start I <br /> potential sites(or rezoning(Sites 1.4,6-11,13,14.and 16-21) 8-11,13.14, that incorporate pre. Department or restart of <br /> and each phase of project activities that have the potential to <br /> 16-21 construction surveys and Review pre-construction construction <br /> result in impacts on breeding birds,the project applicant shall buffer zones.If required, 1 survey reports. during the months I Defe: <br /> lake the following steps to avoid direct losses of nests,eggs, avoidance procedures will be i II active nests are found, of February to <br /> and nestlings and indirect impacts to avian breeding success: implemented inspect construction site to August. <br /> • <br /> • if grading or constructlan activities occur only during the non- The project applicant will hire confirm buffer zones. <br /> breeding season,between August 31 and February 1,no a qualified biologist and the <br /> surveys will be required. project applicant Its <br /> contractor(s)shall engage <br /> • Pruning and removal of trees and othervegetation,including the qualified biologist to <br /> grading of grasslands.should oo ur whenever feasible, conduct precanstructlon <br /> outside the breeding season(February 1 through August 31). surveys as described. . <br /> • During the breeding bird season(February I through August <br /> 31)a qualified biologist will survey activity sites for nesting <br /> ra riots and• sserine birds not more than 14 d - •rior to • <br /> Owena Rvi Mxrenmi end eezo,,e 6-4 EsA I ztwaie <br /> Peal Sgwwness Emaron me Imam gnat Oenmber 1011 <br />