My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
010412
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2011 11:44:41 AM
Creation date
12/28/2011 11:44:39 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/4/2012
DESTRUCT DATE
15Y
DOCUMENT NO
02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j. The project developer shall install a sewer lateral to the Lehman property on Trenery Drive. <br /> The exact location of the lateral shall be determined after the location of the septic tank on <br /> the Lehman property is determined. The location of septic tank and leach field on the <br /> Lehman property and the extension of the sewer main shall be shown on the tentative <br /> subdivision map to the satisfaction of the City Engineer. The existing septic system on the <br /> Lehman property may remain if determined to function adequately by the Alameda County <br /> Health Department. If, however, the existing septic tank and leach field are determined to <br /> be failing, the septic system shall be abandoned per Alameda County Health Department <br /> regulations and Lehman home shall then be connected to the City's sewer system. <br /> k. The project developer shall prepare all necessary documents to the satisfaction of the City <br /> Engineer for the City to quitclaim the surplus street right-of-way behind the proposed back- <br /> of-curb on the south side of Cameron Avenue. The City will retain a Public Service <br /> Easements (PSE) over the area to be quitclaimed for utility purposes. The surplus street <br /> right-of-way will be offered to the Dillon, Lawer, Sussman, Grimes, and Herb properties for <br /> incorporation into their properties. <br /> The project developer shall extend the existing sanitary sewer main in Martin Avenue <br /> northerly from Diablo Court to the Selway property and shall stub a lateral to the Selway <br /> property, unless otherwise required by the City Engineer. The exact location of the lateral <br /> shall be determined after the location of the septic tank on the Selway property is <br /> determined. The location of septic tank and leach field on the Selway property and the <br /> extension of the sewer main shall be shown on the tentative subdivision map to the <br /> satisfaction of the City Engineer. The existing septic system on the Selway property may <br /> remain if determined to function adequately by the Alameda County Health Department. If, <br /> however, the existing septic tank and leach field are determined to be failing, the septic <br /> system shall be abandoned per Alameda County Health Department regulations and the <br /> Selway's home shall then be connected to the City's sewer system. <br /> These revisions and changes shall be shown on the tentative subdivision map, grading plan, and <br /> utility plan to the satisfaction of the Director of Community Development and the City Engineer for <br /> review and approval by the Planning Commission. <br /> 9. With the building permit application for the homes covered by this approval, the project developer <br /> shall submit a noise analysis to the Director of Community Development by a licensed acoustical <br /> consultant detailing the building measures — for example, STC window ratings and wall <br /> construction details— required to achieve an interior noise level of 50 dBA Lmax in bedrooms and <br /> 55 dBA Lmax in other rooms for aircraft noise. The measures detailed in the acoustical analysis <br /> shall be shown on the building permit plans to the satisfaction of the Director of Community <br /> Development and the Chief Building Official before the issuance of the first building permit. <br /> 10. The project developer shall submit to the Director of Community Development with the tentative <br /> subdivision map application, a mitigation plan that will address the suppression of airborne dust <br /> and vermin abatement during project grading and site improvements. The mitigation plan is <br /> subject to review and approval by the Planning Commission at its public hearing. <br /> 11. The project developer shall offer the homeowners of 2033 Palmer Drive (946-4573-149), 2017 <br /> Palmer Drive (946-4573-148), 2081 Palmer Drive (946-4573-152), 2101 Palmer Drive (946-4573- <br /> 153), 2119 Palmer Drive (946-4573-154-02), 2049 Palmer Drive (946-4573-150), and 2065 <br /> Palmer Drive (946-4573-151) the 10-foot wide strip of land to their rear yards shown along the <br /> west side of the project site. <br /> In the event that the homeowners accept the 10-foot strip, this area shall be zoned PUD — MDR, <br /> matching the zoning of the Palmer Drive properties, and shall be incorporated into the zoning <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.