My WebLink
|
Help
|
About
|
Sign Out
ORD 2007
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
5/27/2011 1:04:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/21/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2007
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j. Prior to the issuance of a building permit, the plans shall be revised to show <br /> separate private water mains to each building for fire sprinkler service. <br /> k. A sanitary sewer sampling manhole shall be provided on any new sanitary <br /> sewer lateral from a building with a commercial use, unless otherwise <br /> determined by the City Engineer. <br /> I. Prior to the issuance of a building permit, a typical street section shall be <br /> shown on the plans for each street (including private streets) showing how <br /> the utilities (public water, public sewer, storm drain, private water and <br /> sanitary sewer, fire mains, irrigation mains and joint trench (PG&E, AT&T, & <br /> Comcast) will be placed under the street with the required clearance <br /> between the pipes. The plans shall be subject to the review and approval of <br /> the City Engineer. <br /> m. Prior to the issuance of a building permit, the applicant shall provide a joint <br /> trench plan (PG&E, AT&T, & Comcast) including splice box, switch box and <br /> transformer locations for the City's review and comment with the <br /> improvement plan submittal. All utility boxes for PG&E, AT&T, Comcast and <br /> similar utility companies shall be installed underground, unless the entire <br /> development proposal on the property has been constructed in which case <br /> aboveground boxes may be allowed subject to the approval of a PUD <br /> modification. <br /> n. If the site is subdivided, easement for utilities, cross drainage, shared <br /> vehicle access, and shared parking may be required by the City Engineer <br /> and the Planning Manager. <br /> o. Stormwater treatment shall be required for all roof drainage. <br /> 13. Urban Stormwater Runoff Requirements. <br /> a. All on site stormwater shall be treated on site (as required by the conditions <br /> of approval for this case) before entering the stormwater flow control basin <br /> in the Neighborhood Park. <br /> b. All storm drainage systems shall be designed such that treated stormwater <br /> flows into the stormwater flow control basin in the Neighborhood Park. <br /> c. All on site storm drain pipes and appurtenances shall be privately <br /> maintained. These pipes shall be marked "private". The location of the <br /> markings shall be subject to the review and approval of the City Engineer, <br /> prior to the issuance of a building permit. <br /> d. A storm drain sampling manhole shall be provided on each property, unless <br /> otherwise determined by the City Engineer. <br /> e. Surface level stormwater shall not be permitted to flow onto a property in a <br /> different PUD. If surface level stormwater flows over property lines within <br /> Conditions of Approval/PUD-68 <br /> General Conditions 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.