Laserfiche WebLink
the same PUD, cross drainage easements shall be required prior to the <br /> recordation of the Final Map for the new property. The location of the <br /> easements shall be subject to the review and approval of the City Engineer. <br /> f. Approval of the storm drainage system shall be subject to the review and <br /> approval of the City Engineer and Zone 7, as applicable, that the system is <br /> adequate, connects to an approved point of discharge, meets any and all <br /> applicable requirements of the Alameda County Flood Control District - <br /> Zone 7, meets any and all applicable requirements of the Federal <br /> Emergency Management Flood Hazard Program, the California Department <br /> of Fish and Game, and meets the immediate and long range requirements <br /> of this development and all upstream areas intended to be drained through <br /> this development. <br /> g. Designated unloading areas where food products and/or cleaning products <br /> are delivered shall be covered and designed to drain inward. The drain <br /> shall have a waste separator and shall be connected to the sanitary sewer. <br /> The design of the loading area shall be subject to the review and approval <br /> of the City Engineer and Chief Building Official prior to the issuance of a <br /> building permit. The design, colors, materials, and location of the cover <br /> shall be subject to the review and approval of the Planning Manager, and <br /> the City Engineer and Chief Building Official prior to the issuance of a <br /> building permit. <br /> 14. Emergency Services. <br /> a. Industrial and Commercial Development. The following items will be <br /> provided prior to any construction above the foundation or slab. NOTE: <br /> Periodic inspections will be made for compliance. <br /> (i.) Where multiple buildings are under construction, access shall be <br /> provided around all buildings as specified on the Site Plan Approval or <br /> Exhibit B. <br /> (ii.) Where on site fire hydrant(s) are required, they shall be installed, <br /> flushed and all valves open prior to any construction above the <br /> foundation or slab. This includes concrete-tilt-up and masonry <br /> buildings. Temporary aboveground water storage tanks are not <br /> permitted as alternative water supply sources for commercial and <br /> industrial development. <br /> (iii.) Prior to request for final inspection, all access roads, on site access <br /> and fire hydrants shall be provided. All fire hydrants shall be <br /> acceptance inspected and tested to applicable City Public Works <br /> Standards. <br /> (iv.) Where a project is phased as part of the development approved by the <br /> City, specific access, water supply and fire hydrant installations will be <br /> required as part of each phase. As needed a phasing plan with these <br /> improvements will be required. <br /> (v.) Where on site grading/utility plans are submitted for review and <br /> approval prior to building construction drawings, emergency vehicle <br /> Conditions of Approval/PUD-68 <br /> General Conditions 10 <br />