Laserfiche WebLink
Revision (FLOMR) has been filed and approved by FEMA, unless it can be <br /> demonstrated to the satisfaction of the City Engineer that construction of the <br /> Livermore Flood Protection improvements described in the EIR will be <br /> completed prior to occupancy of any buildings on the Staples Ranch Site. <br /> b. Prior to beginning any construction activities, hydraulic modeling for the <br /> actual Stoneridge Drive bridge designs shall be complete and demonstrate <br /> that channel flow rates, capacity, and velocities in the Arroyo Mocho are not <br /> negatively impacted and scour protection is adequately addressed. The <br /> hydraulic modeling shall be subject to the review and approval of the City <br /> Engineer. The ACSPA shall be responsible for the hydraulic modeling. <br /> 12. Water and Sewer Utilities. <br /> a. The public water line main loop shall be a minimum of 12 inches in <br /> diameter. <br /> b. The public sanitary line main loop shall be a minimum of 8 inches in <br /> diameter. <br /> c. The applicant shall attempt to achieve a public sanitary sewer pipe slope of <br /> 0.005 (0.5%) with a velocity of 2.0% per second. A slope of 0.003 (0.3%) is <br /> acceptable, if necessary to meet site conditions. <br /> d. The applicant shall attempt to achieve a gutter slope of 0.75%. <br /> e. Each parcel shall have a separate water meter, unless waived by the City <br /> Engineer. <br /> f. With the exception of the public water line loop and sewer line loop, all <br /> water and sewer lines on site shall be private laterals. The laterals shall tie <br /> into the public water and sewer lines. <br /> g. All private sewer and water laterals shall be marked "private". The location <br /> of the markings shall be subject to the review and approval of the City <br /> Engineer prior to the issuance of a building permit. <br /> h. All water service laterals shall be equipped with backflow prevention <br /> devices, unless waived by the City Engineer. The type of back flow <br /> prevention device used shall be shown on the plans, prior to the issuance of <br /> a building permit, and shall be subject to the review and approval of the City <br /> Engineer. <br /> i. Utilities to be owned and maintained by the City shall be located in a public <br /> right of way or PSE with sufficient access for maintenance. The location <br /> and width of a PSE shall be subject to the review and approval of the City <br /> Engineer prior to the recordation of a Final Map for the PUD project site or <br /> issuance of a building permit, whichever occurs first. <br /> Conditions of Approval/PUD-68 <br /> General Conditions 8 <br />