Laserfiche WebLink
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> IV. BUILDING INSPECTION DEPARTMENT <br /> D. Mechanical Permit Fees (minimum fee of$50) <br /> PLAN REVIEW <br /> MECHANICAL PLAN REVIEW FEE: 65%of Mechanical Note-the minimum is actually meant to be 1 hr @current rate charged by <br /> When a mechanical plan is submitted for review,the Mechanical Plan Review fee is Permit Fee outside consultants <br /> required at the time plans are submitted. Minimum one-hour <br /> ADDITIONAL MECHANICAL PLAN REVIEW FEE: Time and Material Resolution 99-025;3/1699 <br /> An additional charge may be applied to all plan check correction lists in excess of two Basis <br /> revised or resubmitted plan submittals,or for revisions to previously approved plans. Minimum one-hour <br /> EXPEDITED PLAN CHECK SURCHARGE: 50%of <br /> The following surcharge will be added for all expedited plan reviews. Plan Check fee <br /> PERMIT ISSUANCE <br /> Mechanical Permit Fee I $0.00 increase 35%from 23.50 <br /> MECHANICAL PERMIT UNIT FEE SCHEDULE <br /> (In addition to permit issuance fee) <br /> Furnaces Installation/relocation of forced-air or gravity-type <br /> furnace,floor furnace,wall furnace,suspended <br /> heater,etc.,each <br /> -Up to 99,999 Btu/h,each $20.00 increase 35%from 14.80 <br /> -100,000 Btu/h or greater,each $25.00 increase 35%from 18.20 <br /> Boilers,Compressors,and Absorption Systems <br /> Up to and including 3 HP Up to and including 100,000 BTU/h $20.00 increase 35%from 14.70 <br /> Over 3 HP to 15 HP Over 100.000 to 500,000 BTU/h $37.00 increase 35%from 27.15 <br /> Over 15 HP to 30 HP Over 500.000 to 1,000,000 BTU/h $50.00 increase 35%from 37.25 <br /> Over 30 HP to 50 HP Over 1,000,000 to 1,750,000 BTU/h $75.00 increase 35%from 55.45 <br /> Over 50 HP Over 1,750,000 BTU/h $125.00 increase 35%from 92.65 <br /> Air Handling Units Up to and including 9,999 cubic feet per minute <br /> (cfm),including ducts attached thereto $14.00 increase 35%from 10.65 <br /> 10,000 cfm or greater $25.00 increase 35%from 18.10 <br /> Evaporative Coolers Each evaporative cooler,other than portable type $14.00 increase 35%from 10.65 <br /> Ventilation&Exhaust Ventilation fan,Environmental Air Duct $14.00 increase 35%from 10.65 <br /> Commercial Kitchen Hood $130.00 new fee <br /> Miscellaneous Mechanical For each appliance or piece of equipment regulated <br /> by the Mechanical Code but not classified in other <br /> categories,or for which no other fee is listed in the <br /> table. $14.00 increase 35%from 10.65 <br /> Duct Work Flex,each floor $48.00 increase 35%from 35.20 <br /> Rigid,each floor $75.00 increase 35%from 5800 <br /> Boilers,each $65.00 new fee <br /> Heat Pump,each $20.50 increase 35%from 15.20 <br /> Hydronic System,each $65.00 new fee <br /> Fireplace,factory-built $14.00 increase 35%from 10.40 <br /> Commercial VAV Box,each $20.50 increase 35%from 1520 <br /> Vented Decorative Appliance,each $65.00 new fee <br /> Wood-burning Stove,each $54.00 increase 35%from 40.00 <br /> E. Plumbing Permit Fees (minimum fee of$50.00) <br /> PLAN REVIEW <br /> PLUMBING PLAN REVIEW FEE: 65%of Plumbing Resolution 99-025;3/16/99 <br /> When a plumbing plan is submitted for review,the Plumbing Plan Review fee is Permit Fee Note-the minimum is actually meant to be 1 hr @current rate charged by <br /> required at the time plans are submitted. _ Minimum one-hour outside consultants <br /> ADDITIONAL PLUMBING PLAN REVIEW FEE: <br /> Resolution 99-025;3/1 <br /> An additional charge may be applied to all plan check correction lists in excess of two <br /> Time and Material 3/16/99 <br /> revised or resubmitted plan submittals,or for revisions to previously approved plans. Basis <br /> Minimum one-hour <br /> EXPEDITED PLAN CHECK SURCHARGE: 50%of Plan Check Resolution 99-025;3/1699 <br /> The following surcharge will be added for all expedited plan reviews. Fee <br /> PERMIT ISSUANCE <br /> Plumbing Permit Fee $32.00 increase 35%from 23.50 <br /> PLUMBING PERMIT UNIT FEE SCHEDULE <br /> (In addition to permit issuing fee) <br /> Fixtures and Vents Installation,repair or alteration of each plumbing <br /> $13.25 <br /> fixture or trap or set of fixtures on one trap _ increase 35%from 9.80 <br /> Sewers,Disposal Systems,and Each building sewer $33.25 increase 35%from 14.65 <br /> Interceptors Each FOG interceptor/treatment system $100.00 increase 35%from 74.50;FOG is Fats,Oil Grease.The plumbing code <br /> and muni code do not permit private sewage systems when sewer is <br /> _ available. <br /> Each industrial waste pretreatment interceptor $27.00 increase 35%from 19.90 <br /> Rainwater systems-per drain $13.25 increase 35%from 9.80 <br /> Water Repiping,Residential Each installation,alteration,or repair of water piping <br /> and/or water treating equipment,per dwelling or unit <br /> $65.00 new w replace old water piping&water beaters item,Wafer heaters new item <br /> 5/10/2011 IV.Building:7 of 11 <br />