CITY OF PLEASANTON
<br /> MASTER FEE SCHEDULE
<br /> IV. BUILDING INSPECTION DEPARTMENT
<br /> D. Mechanical Permit Fees (minimum fee of$50)
<br /> PLAN REVIEW
<br /> MECHANICAL PLAN REVIEW FEE: 65%of Mechanical Note-the minimum is actually meant to be 1 hr @current rate charged by
<br /> When a mechanical plan is submitted for review,the Mechanical Plan Review fee is Permit Fee outside consultants
<br /> required at the time plans are submitted. Minimum one-hour
<br /> ADDITIONAL MECHANICAL PLAN REVIEW FEE: Time and Material Resolution 99-025;3/1699
<br /> An additional charge may be applied to all plan check correction lists in excess of two Basis
<br /> revised or resubmitted plan submittals,or for revisions to previously approved plans. Minimum one-hour
<br /> EXPEDITED PLAN CHECK SURCHARGE: 50%of
<br /> The following surcharge will be added for all expedited plan reviews. Plan Check fee
<br /> PERMIT ISSUANCE
<br /> Mechanical Permit Fee I $0.00 increase 35%from 23.50
<br /> MECHANICAL PERMIT UNIT FEE SCHEDULE
<br /> (In addition to permit issuance fee)
<br /> Furnaces Installation/relocation of forced-air or gravity-type
<br /> furnace,floor furnace,wall furnace,suspended
<br /> heater,etc.,each
<br /> -Up to 99,999 Btu/h,each $20.00 increase 35%from 14.80
<br /> -100,000 Btu/h or greater,each $25.00 increase 35%from 18.20
<br /> Boilers,Compressors,and Absorption Systems
<br /> Up to and including 3 HP Up to and including 100,000 BTU/h $20.00 increase 35%from 14.70
<br /> Over 3 HP to 15 HP Over 100.000 to 500,000 BTU/h $37.00 increase 35%from 27.15
<br /> Over 15 HP to 30 HP Over 500.000 to 1,000,000 BTU/h $50.00 increase 35%from 37.25
<br /> Over 30 HP to 50 HP Over 1,000,000 to 1,750,000 BTU/h $75.00 increase 35%from 55.45
<br /> Over 50 HP Over 1,750,000 BTU/h $125.00 increase 35%from 92.65
<br /> Air Handling Units Up to and including 9,999 cubic feet per minute
<br /> (cfm),including ducts attached thereto $14.00 increase 35%from 10.65
<br /> 10,000 cfm or greater $25.00 increase 35%from 18.10
<br /> Evaporative Coolers Each evaporative cooler,other than portable type $14.00 increase 35%from 10.65
<br /> Ventilation&Exhaust Ventilation fan,Environmental Air Duct $14.00 increase 35%from 10.65
<br /> Commercial Kitchen Hood $130.00 new fee
<br /> Miscellaneous Mechanical For each appliance or piece of equipment regulated
<br /> by the Mechanical Code but not classified in other
<br /> categories,or for which no other fee is listed in the
<br /> table. $14.00 increase 35%from 10.65
<br /> Duct Work Flex,each floor $48.00 increase 35%from 35.20
<br /> Rigid,each floor $75.00 increase 35%from 5800
<br /> Boilers,each $65.00 new fee
<br /> Heat Pump,each $20.50 increase 35%from 15.20
<br /> Hydronic System,each $65.00 new fee
<br /> Fireplace,factory-built $14.00 increase 35%from 10.40
<br /> Commercial VAV Box,each $20.50 increase 35%from 1520
<br /> Vented Decorative Appliance,each $65.00 new fee
<br /> Wood-burning Stove,each $54.00 increase 35%from 40.00
<br /> E. Plumbing Permit Fees (minimum fee of$50.00)
<br /> PLAN REVIEW
<br /> PLUMBING PLAN REVIEW FEE: 65%of Plumbing Resolution 99-025;3/16/99
<br /> When a plumbing plan is submitted for review,the Plumbing Plan Review fee is Permit Fee Note-the minimum is actually meant to be 1 hr @current rate charged by
<br /> required at the time plans are submitted. _ Minimum one-hour outside consultants
<br /> ADDITIONAL PLUMBING PLAN REVIEW FEE:
<br /> Resolution 99-025;3/1
<br /> An additional charge may be applied to all plan check correction lists in excess of two
<br /> Time and Material 3/16/99
<br /> revised or resubmitted plan submittals,or for revisions to previously approved plans. Basis
<br /> Minimum one-hour
<br /> EXPEDITED PLAN CHECK SURCHARGE: 50%of Plan Check Resolution 99-025;3/1699
<br /> The following surcharge will be added for all expedited plan reviews. Fee
<br /> PERMIT ISSUANCE
<br /> Plumbing Permit Fee $32.00 increase 35%from 23.50
<br /> PLUMBING PERMIT UNIT FEE SCHEDULE
<br /> (In addition to permit issuing fee)
<br /> Fixtures and Vents Installation,repair or alteration of each plumbing
<br /> $13.25
<br /> fixture or trap or set of fixtures on one trap _ increase 35%from 9.80
<br /> Sewers,Disposal Systems,and Each building sewer $33.25 increase 35%from 14.65
<br /> Interceptors Each FOG interceptor/treatment system $100.00 increase 35%from 74.50;FOG is Fats,Oil Grease.The plumbing code
<br /> and muni code do not permit private sewage systems when sewer is
<br /> _ available.
<br /> Each industrial waste pretreatment interceptor $27.00 increase 35%from 19.90
<br /> Rainwater systems-per drain $13.25 increase 35%from 9.80
<br /> Water Repiping,Residential Each installation,alteration,or repair of water piping
<br /> and/or water treating equipment,per dwelling or unit
<br /> $65.00 new w replace old water piping&water beaters item,Wafer heaters new item
<br /> 5/10/2011 IV.Building:7 of 11