CITY OF PLEASANTON
<br /> MASTER FEE SCHEDULE
<br /> IV. BUILDING INSPECTION DEPARTMENT
<br /> Gas Piping Systems 1 to 5 outlets $8.25 increase 35%from 615
<br /> over 5 outlets,per outlet $1.50 increase 35%from 1.10
<br /> Vacuum Breakers,and Backflow Atmospheric-type vacuum breakers:
<br /> Protection Devices - Ito 5 $17.00 increase 35%from 12.60
<br /> - over 5,each $3.00 increase 35%from 2.25
<br /> Backflow protective device other than atmospheric-
<br /> type vacuum breakers,each:
<br /> - 2 inches and smaller $16.75 increase35%from 12.30
<br /> - over 2 inches $33.25 increase 35%from 24.65
<br /> Swimming Pools&Spas Public Pool plumbing,each $125.00 increase 35%from 91.25
<br /> Public Spa plumbing,each $8200 increase 35%from 60.75
<br /> Private Pool plumbing,each $82.00 increase 35%from 60.75
<br /> Private Spa plumbing,each $41.00 increase 35%from 30.25
<br /> Miscellaneous Plumbing For each appliance or piece of equipment regulated
<br /> by the Plumbing Code but not classified in other
<br /> categories,or for which no other fee is listed $13.25 increase 35%from 9.80
<br /> PG&E Reconnection Gas Inspection,each $32.50 increase 35%from 24.00
<br /> Water Heater,Residential Storage Tank type,each $16.75 increase 35%from 12.30
<br /> Water Heater,Tankless,each $65.00 increase 35%from 48.00
<br /> Water Heater,Commercial,each $85.00 new
<br /> Solar Water Heating System,each _ $65.00 new
<br /> Water Recirculating system,each _ $65.00 increase 35%from 48.00
<br /> Rainwater Onsite Treatment,each $65.00 new
<br /> Water Line Connections,each $6.50 increase 35%from 4.80
<br /> Water Service $43.00 increase 35%from 32.00
<br /> Water Softener,each $16.25 increase 35%from 12.00
<br /> F. Gradin! Fees
<br /> Plan Review Permit grading fees t addressed in fee study
<br /> 50 cubic ards or less no charge $23.50 1997 UBC
<br /> Minimum
<br /> 51 to 100 cubic ards one-hour $37.00 1997 UBC
<br /> Minimum
<br /> 101 to 1,000 cubic yards one-hour 1997 UBC
<br /> first 100 cubic yards $37.00 1997 UBC
<br /> each additional 100 or fraction thereof $17.50 1997UBC
<br /> Minimum
<br /> 1,001 to 10,000 cubic yards one-hour 1997 UBC
<br /> first 1,000 cubic yards $194.50 1997UBC The lees also apply to
<br /> each additional 1,000 or fraction thereof $14.50 1997 UBC subdivision plan review&
<br /> 10,001 to 100,000 cubic yards inspection as referenced in PW
<br /> first 10,000 cubic yards $49.25 $325.00 1997UBC chapt IV,sections C8D
<br /> each additional 10,000 or fraction thereof $24.50 $66.00 1997UBC
<br /> 100,001 to 200,000 cubic yards
<br /> first 100,000 cubic yards $269.75 $919.00 1997UBC
<br /> each additional 10,000 or fraction thereof _ $13.25 $36.50 1997UBC
<br /> 201,000 cubic yards or more
<br /> first 200,000 cubic yards $402.25 $1,284.00 1997 UBC
<br /> each additional 10,000 or fraction thereof $7.25 $36.50 1997UBC
<br /> H. Other Fees
<br /> Inspections outside normal business hours(min.charge-2 hrs) Cost+Overhead 1997 UBC
<br /> New or special request reports Cost+Overhead
<br /> Reinspection fees(min.charge-2 hrs) Cost+Overhead 1997 UBC
<br /> Inspections for which no fee is specifically indicated(minimum charge-2 hrs) Cost+Overhead 1997 UBC
<br /> Additional plan review required by changes,additions,or revisions to approved plans
<br /> (minimum charge-1 hour) Cost+Overhead 1997 UBC,Already covered elsewhere
<br /> STATE OF CALIFORNIA FEES Fees set by State of California;City retains 5%for admin
<br /> Strong Motion Instrumentation Study Residential,per$1,000 construction valuation $0.07
<br /> Tax ($.50 min)
<br /> Non Residential,per$1,000 construction valuation r $0.15
<br /> ($.50 min)
<br /> Seismic Hazards Identification Fund Residential,per$1,000 construction valuation $0.03
<br /> ($.50 min)
<br /> Non Residential,per$1,000 construction valuation $0.06
<br /> _ ($.50 min)
<br /> Building Standards Special Revolving per$25,000 valuation or fraction thereof $1.00 new fee effective 1/1/09 not reflected on previous MFS
<br /> Fund(SB 1473)
<br /> 5/10/2011 IV.Building.8 of 11
<br />
|