CITY OF PLEASANTON
<br /> MASTER FEE SCHEDULE
<br /> IV. BUILDING INSPECTION DEPARTMENT
<br /> GREEN BUILDING PLAN REVIEW FEE 25%of Building new-recent requirement not in previous MFS
<br /> For all covered •ro ects Permit Fee
<br /> SWPPP(STORM WATER)PLAN REVIEW FEE 25%of Building new recent requirement not in previous MFS
<br /> For all covered •ro ects Permit Fee
<br /> ONSITE IMPROVEMENTS PLAN REVIEW FEE 0.6%of On-Site Resolution 99-025;311699
<br /> Valuation
<br /> FOUNDATION ONLY PLAN REVIEW FEE 65%of Foundation Resolution 99-025;3/1699
<br /> Permit Fee
<br /> ADDITIONAL PLAN REVIEW FEE:
<br /> An additional charge may be applied when more than two resubmittals require review Time and Material
<br /> to the intital plan review,or for revisions to previously approved plans and permits. Basis
<br /> EXPEDITED PLAN CHECK SURCHARGE: 50%of Resolution 99-025;3/1699
<br /> The followin• surcha ee will be added for all ex•eclited plan reviews. Plan Check fee
<br /> ADMINISTRATIVE CHARGE FOR PLAN CHANGE REQUESTS:
<br /> This charge will be assessed for the administrative costs associated with plan change requests after Time and Material
<br /> issuance of building,electrical,mechanical,plumbing and grading permits. Said costs covered by this Basis
<br /> charge include,but are limited to,rechecking of plot plans,refiguring applicable fees,extra application $20.00 Minimum
<br /> forms,and processing time of City personnel.
<br /> C. Electrical Permit Fees (minimum fee$50.00)
<br /> PLAN REVIEW
<br /> ELECTRICAL PLAN REVIEW FEE:
<br /> 65%of Electric Resolution 99-025;311699
<br /> When an electrical plan is submitted for review,the Electrical Plan Review fee is Permit Fee
<br /> required at the time plans are submitted. Minimum one-hour
<br /> ADDITIONAL ELECTRICAL PLAN REVIEW FEE: Time and Material Resolution 99-025;3/1699
<br /> An additional charge may be applied to all plan check correct on lists in excess of two revised or Basis
<br /> resubmitted plan submittals,or for revisions to previously apk roved plans. Minimum one-hour
<br /> EXPEDITED PLAN REVIEW SURCHARGE: 50%of
<br /> The following surcharge will be added for all expedited plan reviews. Plan Check fee
<br /> PERMIT ISSUANCE Resolution 99-025;3/1699
<br /> Electrical Permit Fee $32.00 increase 35%-old fee 2a50
<br /> SYSTEM PERMIT FEE SCHEDULE
<br /> Temporary Power Service Each Temporary Service Power Pole or Pedestal,
<br /> including all pole or pedestal-mounted receptacle
<br /> outlets and appurtenances $32.00 increase 35%-old fee 23.50
<br /> ELECTRICAL PERMIT UNIT FEE SCHEDULE
<br /> (in addition to permit issuance fee)
<br /> Receptacles,Luminaires,Switches,or other Outlets
<br /> - First 20 outlets,each $1.50 increase 35%from 1.10
<br /> - Additional outlets,each $1.00 increase 35%from.73
<br /> - Pole or platform-mounted lighting fixtures,each $1.50 increase 35%from 1.10
<br /> - Theatrical-type lighting fixt.or assemblies.each $1.50 increase 35%from 1.10
<br /> Residential Electrical Appliances Fixed appliances or receptacle outlets for same,
<br /> each $6.40 increase 35%from 4.75
<br /> Power Apparatus
<br /> Air Conditioning Units,Motors,Generators,Cooking or Baking equipment,Rectifiers,Synchronous Converters,Capacitors,Industrial
<br /> Heating,and Heat Pumps or other apparatus as follows:
<br /> Up to and including 1,each $6.40 increase 35%from 4.75
<br /> (Rating in HP,kW, Over 1 but not over 10,each $16.60 increase 35%from 12.30
<br /> kVA,or kVAR) Over 10 but not over 50,each $33.00 increase 35%from 24.60
<br /> Over 50 but not over 100,each $67.00 increase 35%from 49.50
<br /> Over 100,each $100.00 increase 35%from 74.50
<br /> Dosways
<br /> Trolley and plug-in type busways,per 100 sq.ft or fraction thereof $10.00 increase 35%from 7.25
<br /> Signs,Outline Lighting and Marquees
<br /> Illuminated signs,outline lighting systems/marquees on a branch circuit,each $33.00 increase 35%from 24.60
<br /> Services and Other Panels
<br /> Electrical panels,up to 199 Amp,each $40.00 increase 35%from 30.50
<br /> Electrical panels,up to 999 Amp,each $85.00 increase 35%from 62.15
<br /> Electrical panels,over 800 volts OR 1,000 Am 1and greater,each $170.00 increase 35%from 124.30
<br /> Miscellaneous Electrical
<br /> Electrical apparatus,conduits and conductors for which a permit is required but for
<br /> which no fee is herein set forth $24.50 increase 35%from 18.20
<br /> General Circuits,each _ $7.00 increase 35%from 5.20
<br /> Generators $65.00 new fee
<br /> Non-Residential Electrical Appliances _ $65.00 new fee
<br /> new fee-Currently charging per panel,which is not is Master Fee
<br /> Photovoltaic Systems,Residential,per dwelling system $150.00 Schedule,but more efficient to create fiat fee.
<br /> Photovoltaic Systems,Non-Residential,per kilowatt $30.00 new fee-Currently charging per panel,which is not is Master Fee Schedule.
<br /> Spa,Self Contained Portable Type $65.00 new fee
<br /> 5/10/2011 IV.Building:6 of 11
<br />
|