Laserfiche WebLink
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> IV. BUILDING INSPECTION DEPARTMENT <br /> GREEN BUILDING PLAN REVIEW FEE 25%of Building new-recent requirement not in previous MFS <br /> For all covered •ro ects Permit Fee <br /> SWPPP(STORM WATER)PLAN REVIEW FEE 25%of Building new recent requirement not in previous MFS <br /> For all covered •ro ects Permit Fee <br /> ONSITE IMPROVEMENTS PLAN REVIEW FEE 0.6%of On-Site Resolution 99-025;311699 <br /> Valuation <br /> FOUNDATION ONLY PLAN REVIEW FEE 65%of Foundation Resolution 99-025;3/1699 <br /> Permit Fee <br /> ADDITIONAL PLAN REVIEW FEE: <br /> An additional charge may be applied when more than two resubmittals require review Time and Material <br /> to the intital plan review,or for revisions to previously approved plans and permits. Basis <br /> EXPEDITED PLAN CHECK SURCHARGE: 50%of Resolution 99-025;3/1699 <br /> The followin• surcha ee will be added for all ex•eclited plan reviews. Plan Check fee <br /> ADMINISTRATIVE CHARGE FOR PLAN CHANGE REQUESTS: <br /> This charge will be assessed for the administrative costs associated with plan change requests after Time and Material <br /> issuance of building,electrical,mechanical,plumbing and grading permits. Said costs covered by this Basis <br /> charge include,but are limited to,rechecking of plot plans,refiguring applicable fees,extra application $20.00 Minimum <br /> forms,and processing time of City personnel. <br /> C. Electrical Permit Fees (minimum fee$50.00) <br /> PLAN REVIEW <br /> ELECTRICAL PLAN REVIEW FEE: <br /> 65%of Electric Resolution 99-025;311699 <br /> When an electrical plan is submitted for review,the Electrical Plan Review fee is Permit Fee <br /> required at the time plans are submitted. Minimum one-hour <br /> ADDITIONAL ELECTRICAL PLAN REVIEW FEE: Time and Material Resolution 99-025;3/1699 <br /> An additional charge may be applied to all plan check correct on lists in excess of two revised or Basis <br /> resubmitted plan submittals,or for revisions to previously apk roved plans. Minimum one-hour <br /> EXPEDITED PLAN REVIEW SURCHARGE: 50%of <br /> The following surcharge will be added for all expedited plan reviews. Plan Check fee <br /> PERMIT ISSUANCE Resolution 99-025;3/1699 <br /> Electrical Permit Fee $32.00 increase 35%-old fee 2a50 <br /> SYSTEM PERMIT FEE SCHEDULE <br /> Temporary Power Service Each Temporary Service Power Pole or Pedestal, <br /> including all pole or pedestal-mounted receptacle <br /> outlets and appurtenances $32.00 increase 35%-old fee 23.50 <br /> ELECTRICAL PERMIT UNIT FEE SCHEDULE <br /> (in addition to permit issuance fee) <br /> Receptacles,Luminaires,Switches,or other Outlets <br /> - First 20 outlets,each $1.50 increase 35%from 1.10 <br /> - Additional outlets,each $1.00 increase 35%from.73 <br /> - Pole or platform-mounted lighting fixtures,each $1.50 increase 35%from 1.10 <br /> - Theatrical-type lighting fixt.or assemblies.each $1.50 increase 35%from 1.10 <br /> Residential Electrical Appliances Fixed appliances or receptacle outlets for same, <br /> each $6.40 increase 35%from 4.75 <br /> Power Apparatus <br /> Air Conditioning Units,Motors,Generators,Cooking or Baking equipment,Rectifiers,Synchronous Converters,Capacitors,Industrial <br /> Heating,and Heat Pumps or other apparatus as follows: <br /> Up to and including 1,each $6.40 increase 35%from 4.75 <br /> (Rating in HP,kW, Over 1 but not over 10,each $16.60 increase 35%from 12.30 <br /> kVA,or kVAR) Over 10 but not over 50,each $33.00 increase 35%from 24.60 <br /> Over 50 but not over 100,each $67.00 increase 35%from 49.50 <br /> Over 100,each $100.00 increase 35%from 74.50 <br /> Dosways <br /> Trolley and plug-in type busways,per 100 sq.ft or fraction thereof $10.00 increase 35%from 7.25 <br /> Signs,Outline Lighting and Marquees <br /> Illuminated signs,outline lighting systems/marquees on a branch circuit,each $33.00 increase 35%from 24.60 <br /> Services and Other Panels <br /> Electrical panels,up to 199 Amp,each $40.00 increase 35%from 30.50 <br /> Electrical panels,up to 999 Amp,each $85.00 increase 35%from 62.15 <br /> Electrical panels,over 800 volts OR 1,000 Am 1and greater,each $170.00 increase 35%from 124.30 <br /> Miscellaneous Electrical <br /> Electrical apparatus,conduits and conductors for which a permit is required but for <br /> which no fee is herein set forth $24.50 increase 35%from 18.20 <br /> General Circuits,each _ $7.00 increase 35%from 5.20 <br /> Generators $65.00 new fee <br /> Non-Residential Electrical Appliances _ $65.00 new fee <br /> new fee-Currently charging per panel,which is not is Master Fee <br /> Photovoltaic Systems,Residential,per dwelling system $150.00 Schedule,but more efficient to create fiat fee. <br /> Photovoltaic Systems,Non-Residential,per kilowatt $30.00 new fee-Currently charging per panel,which is not is Master Fee Schedule. <br /> Spa,Self Contained Portable Type $65.00 new fee <br /> 5/10/2011 IV.Building:6 of 11 <br />