CITY OF PLEASANTON
<br /> MASTER FEE SCHEDULE
<br /> IV. BUILDING INSPECTION DEPARTMENT
<br /> A. General
<br /> Copies Soils Resorts- oer page $0.25
<br /> Standard Monthly Reports-per copy $7.50
<br /> Private Develo•ment Guidelines-per copy $5.00
<br /> Document Submittal Per•Ian sheet $2.00 Resolution 99-025;311699
<br /> Archivin s Per•a se of susporting documents $0.25
<br /> GIS Mapping
<br /> New Commercial,Multi-famil and Condominium site area,per square foot $0.002
<br /> Housing and Miscellaneous Inspections Time&Material Added misc,time&mat,and 1-hr instead of absolute amt
<br /> Ins•-ction of existin.structure at owner's res uest) Minimum one-hour
<br /> B. Building Permit Fees
<br /> BASIC PERMIT FEE SCHEDULE last changed by Resolution 99-025;371699
<br /> Total Project Valuation Base Fee Plus
<br /> $1 -$500 $85.00 incr from$23.50
<br /> $501-$2,000 $85.00 $3.00 for each additional$100(or fraction thereof)up to and
<br /> including$2,000 incr from$23.50rdecr fr$3.05
<br /> $2,001-$25,000 $130.00 $17.30 for each additional$1,000(or fraction thereof)up to
<br /> and including$25,000 incr from$6925814
<br /> $25,001-$50,000 $528.00 $13.64 for each additional$1,000(or fraction thereof)up to
<br /> and including$50,000 incr from 391.25/10.10
<br /> $50,001-$100,000 $869.00 $9.44 for each additional$1,000(or fraction thereof)up to
<br /> and including$100,000 incr from 643.75400
<br /> $100,001-$500,000 $1,341.00 $7.56 for each additional$1,000(or fraction thereof)up to
<br /> and including$500,000 incr from 993.7515.60
<br /> $500,000-$1,000,000 $4,365 00 $6.41 for each additional$1,000(or fraction thereof)up to
<br /> and including$1,000,000 jeer from 3233.75/4.75
<br /> over$1,000,000 $7,570.00 $4.92 for each additional$1,000(or fraction thereof)
<br /> incr from 5608.75/3.65
<br /> VALUATION SCHEDULE Resolution 99-025;3/16199
<br /> NEW CONSTRUCTION&ADDITIONS Consistent with current definition in PMC 20.04.015'.VALUATION or VALUE
<br /> -Commercial&Industrial Buildings Valuation per square foot shall be determined at the date of application as applied to a building and its building and/or property service equipment
<br /> as determined by the Building and Safety Official. Rates are updated shall be the estimated cost to consWCl or replace the building and its
<br /> -Dwellings annually,or as determinated by the Building and Safety Official. p g
<br /> -Gates es&Accessory Structures building and/or property service equipment in kind,based on current labor
<br /> ALTERATIONS&REPAIRS and material replacement costs as determined by the Building and Safety
<br /> -Remodels,Repairs,Reroofs,Fire Sprinklers,Tenant Contract price,or as otherwise determined by Building and Safety Official.
<br /> Im•rovements,etc. Official.
<br /> OTHER BUILDING PERMIT FEES,SUPPLEMENTS,AND SURCHARGES last changed by Resolution 99-025:3/1699
<br /> INVESTIGATION FEE - 100%of Building New,consistent with PMC 20.04.015 section 304A.5.2,and Building Codes.
<br /> Applicable to any work commenced on a building,structure,electrical,gas.mechanical or plumbing
<br /> Permit Fee
<br /> system before obtaining the necessary permits,in addition to the required fees
<br /> ENERGY SURCHARGE NEW-Energy regulations affect envelope and lighting,in addition to heating
<br /> Applicable to buildings and portions thereof subject to Tide 2r.,Part 6,The California Energy Code 25%of Building /cooling.
<br /> Permit Fee
<br /> FOUNDATION ONLY PERMIT 10%of Building
<br /> _ Permit Fee
<br /> ALTERNATE MEANS&METHODS REQUESTS Time&Material new
<br /> Plan review requests for alternate means and methods_ 1-hour min.
<br /> ON-SITE PERMIT 1.4%of On-Site Resolution 99-025',3116199
<br /> Applicable to improvements outside of buildings,based upon valuaton Valuation
<br /> WASTE MANAGEMENT PLAN FEE Time and Material new-'Waste management plan fee'or'WMP fee"means a nonrefundable
<br /> Nonrefundable fee to administer and implement the WMP review and verification on Basis, fee set by the city council to administer and implement this chapter.(Ord.
<br /> covered projects Minimum two-hour 1992§1,2009)PMC 9.20.010
<br /> PLUMBING/MECHANICAL/ELECTRICAL(PME)SUPPLEMENT new-replaces PME cyst fees(deleted in PME sections below)or indiv
<br /> Applicable to all new and alteration projects with multi-trade construction being 25%of Building fixture counts
<br /> Permit Fee
<br /> performed in conjuction with a building permit.
<br /> BUILDING PLAN REVIEW FEES
<br /> BUILDING PLAN REVIEW FEE 65%of Building
<br /> When submittal documents are required,a plan review fee shall be paid at the time of permit Fee
<br /> submittis documents for'Ian review. _
<br /> DEFERRED SUBMITTALS new-This is a review of the deferred submittal,so I relocated it to the Plan
<br /> Required at the time of deferred submission of plans and documentation whenever
<br /> 5%of Building Review Section.
<br /> each additional project component,such as sub-trade plans,truss packages,fire
<br /> Permit Fee
<br /> sprinkler plans,etc.,are not submitted concurrent with the original review of plans and
<br /> sus•ortim documents.
<br /> COPY MODEL PLAN REVIEW FEE 25%of Building Resolution 99-025;3/16/99
<br /> For each production building permit of a development after the model has been Permit Fee
<br /> a•sroved,the followin• sten check fee will be assessed.
<br /> ACCESSIBILITY PLAN REVIEW FEE 15%of Building
<br /> Applicable to all plans checked for compliance with State of California Accessibility
<br /> Permit Fee
<br /> Requirements. This is charged in addition to the initial plan check fee.
<br /> 5/10/2011 IV.Building'.5 of 11
<br />
|