Laserfiche WebLink
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> III.COMMUNITY DEVELOPMENT/ENGINEERING DIVISION <br /> Amended Maps Base fee $140.00 incr from$100 <br /> plus fee per course correction $30.00 incr from$10 <br /> Lot Line Adjustment Base fee $1,330.00 incr from$200 <br /> plus fee per lot $40.00 incr from$10 <br /> Revised Erosion Hillside Base Fee $5,000.00 new <br /> Control(SWPPP) plus fee per acre(disturbed area) $180.00 new <br /> Flatland Base Fee $3,200.00 new <br /> plus fee per acre(disturbed area) $135.00 new <br /> Professional Consultant Expense Consultant cost new <br /> +25%of Consultant <br /> Cost <br /> Subdivision Grading& up to 100,000 cubic yards see Chapter IV <br /> Erosion Control Plan Section F <br /> Check each additional 1,000 cubic yard after 100,000 $6.50 <br /> D. Construction Services Inspection <br /> (due 15 days prior to City Council approval of a final map or City Engineer approval of the plans, whichever <br /> occurs first) <br /> .• -:: ; .: .:•. _- _• __.( 4.06k replaced by Construction l ns p Table below <br /> Subdivision Grading& Up to 100,000 cubic yards see Chapter IV <br /> Erosion Control Section F <br /> Inspection each additional 1,000 cubic yards over 100.000 $10.00 <br /> 4:0034 replaced by Construction Insp Table below <br /> 4400% replaced by Construction limp Table below <br /> 490% replaced by Construction lnsp Table below <br /> Construction Inspection <br /> City-inspected improvements: Base Fee Plus <br /> Valuation under$5,000 7.2%of valuation incr from 4%of valuation <br /> Valuation$5,000-$20,000 $360 2.76%of valuation>$5,000 ch from 4%of valuation <br /> Valuation over$20,000 $774 4%of valuation>$20,000 ch from 4%of valuation <br /> Specialized Inspections Consultant cost <br /> +25%of Consultant <br /> _ Cost changed from Cost+Overhead <br /> Overtime Inspection <br /> (2 hour minimum charge) _ Cost+Overhead <br /> E. Assessment Districts <br /> City Engineering Department Administration <br /> durin. formation,desi.n,and construction Cost+Overhead <br /> Inspection <br /> See Construction <br /> Minimum cha .e is 4%of costs to construct public improvements) Inspec.Fee Table <br /> Segregation Administration <br /> Fee.er district $500.00 <br /> Park Dedication In I i_u Fees move to Development Fee section <br /> :::..- -. : :• . - 26, 1081) move to Development Fee section <br /> :.. .. . :.: see-Chapter-XI <br /> per-lot-or-unit l-(detached) Section A move to Development Fee section <br /> see-Chaptecal <br /> Mekiple-Family-Residential_(agachad) Section-A move to Development Fee section <br /> 5/10/2011 III.Community Development:4 of 11 <br />