My WebLink
|
Help
|
About
|
Sign Out
ATTACHMENT 04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
051711
>
BUDGET WORKSHOP
>
ATTACHMENT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 5:45:05 PM
Creation date
5/12/2011 5:43:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/17/2011
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> III.COMMUNITY DEVELOPMENT/ENGINEERING DIVISION <br /> A. General <br /> Map-Copies $nn_c....,fe_;,,,cr.,.,.r r. - $440 delete-map fees restructured below <br /> 800-Scale-Sepia 54040 delete-map fees restructured below <br /> 200!salaOdho-Photo 42,60 delete-map fees restructured below <br /> 800L-Seale-04h»-photo $440 delete-map fees restructured below <br /> 500 Scale-Map Water-(2 sheets) oath $340 delete-map fees restructured below <br /> $740 delete-map fees restructured below <br /> Small City Map $260 delete-map fees restructured below <br /> 24—2.6"-Sheets $200 delete-map fees restructured below <br /> 18!!x26'•-Sheets $249 delete-map fees restructured below <br /> $0:50 delete-map fees restructured below <br /> $1A0 delete-map fees restructured below <br /> Map Copies Map Reproduction(per sheet) $5.00 <br /> Plotted GIS Map(per sheet) $30.00 <br /> Specialized Map/Data Request Time&Materials <br /> Other Copies Standard Specifications&Details $20.00 <br /> Standard-Details $540 <br /> Subdivision-Ordinance 544I0 <br /> B. Encroachment (Due upon obtaining permit) <br /> Permit Fee Inspection Fee <br /> Driveway $2440 $00,00 replaced by Permit&Inspection fees below <br /> Peel $2840 500,00 replaced by Permit&Inspection fees below <br /> 528,09 500,00 replaced by Permit&Inspection fees below <br /> uulitY _ sett-+-overhead lest+overhead replaced by Permit&Inspection fees below <br /> $.torm/Sanitary Lateral _ $80,00 $11040 replaced by Permit&Inspection fees below <br /> Planter-Strip _ $25,00 ANA- replaced by Permit&Inspection fees below <br /> Dempster Storage $25:00 N/A- replaced by Permit&Inspection fees below <br /> Throufth.Curb-Drain $26,00 $90-00 replaced by Permit&Inspection fees below <br /> _ $8040 $310-00 replaced by Permit&Inspection fees below <br /> Tree-Removal _ $25:00 $0900 replaced by Permit&Inspection fees below <br /> Permit Fees CS Utilities $150.00 incr from$50 <br /> _Other $30.00 incr from$25 <br /> Inspection Fees Dry Utilities Time&Materials ch from cost+OH <br /> Other Valuation under$5,000 7.2%of valuation incr from$90$110 <br /> Valuation$5,000 to$20,000 $360+2.76%of value over$5,000 incr from$90-$110 <br /> Valuation over$20,000 $774+4%of value over$20,000 incr from$90-$110 <br /> Reinspection Time&Materials new <br /> Specialized Inspections Consultant cost changed from T&M <br /> +25%of Consultant <br /> Cost <br /> Oversize Load Permit-Fee to One-time $16.00 incr from$15 to State allowable max <br /> update upon State fee change Annual $90.00 incr from$70 to State allowable max <br /> Haul Route Permit $60.00 not previously in MFS but charge was$25 <br /> C. Private Development Review (Due upon first submittal of plans or map) <br /> Parcel Map Base fee $2,500.00 incr from$600-does not loci improvement PC <br /> plus fee per lot $30.00 decr from$50-does not loci improvement PC <br /> Final Map Base fee $4,500.00 incr from$600-does not loci improvement PC <br /> plus fee per lot $30.00 decr from$50-does not loci improvement PC <br /> GIS Digital Compliance Time&Materials or new <br /> Consultant cost + <br /> 25%of Consultant <br /> Cost <br /> Annexation Fees Annexation Processing Fee $8,790.00 incr from$2,500 <br /> Pre-Annexation Agreement Processing $4,470.00 new <br /> GHAD Formation/Annexation Fee $3,150.00 new <br /> Development Improvement Plan Check <br /> incr from 2%/$600 min-applies to total project <br /> cost instead of just commercial offsite <br /> percentage of total cost of City-reviewed improvements 2.1% improvements <br /> Improvement Plan ReviewlRevislon&Plan Check <br /> after 4th revision _ $790.00 new <br /> Traffic Signal(commercial off-site) <br /> Plan Check $2,000.00 <br /> Right of Way Dedication and Abandonment $1,380.00 incr from$50 <br /> Technology Fee(GIS Mapping)-per lot $50.00 incr from$28/lot <br /> Tract Joint Trench Plan Check $500.00 <br /> Traffic Study Review _ $650.00 <br /> 5/10/2011 III.Community Development:3 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.