My WebLink
|
Help
|
About
|
Sign Out
PC 091510
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2010-2019
>
2010
>
PC 091510
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 3:14:47 PM
Creation date
4/19/2011 3:27:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
9/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
circumstance that caused this. He advised that the LPFD will continue to be in touch <br />with PG&E to find out more information about shut-off’s. <br />Commissioner Blank stated that he had asked about the possibility of automatic shut-off <br />valves being required as potentially a City ordinance for any high pressure lines that <br />could come within the Pleasanton city limits. He inquired how well prepared the LPFD <br />was to deal with a high pressure gas leak or high pressure liquid gas leak in terms of <br />communication, evacuation, etc. <br />Chief Miguel replied that LPFD is well prepared and already has an extensive hazard <br />mitigation plan and emergency response plan which includes all situations. He added <br />that LPFD staff have an extensive amount of training in dealing with liquid fuel fires. He <br />noted that the amount and speed of help received by San Bruno from cities in Alameda <br />County and San Francisco was most impressive. He indicated that he was confident <br />with the LPFD staff’s training and equipment beyond the standard ICS plans, and <br />acknowledged that help from neighboring departments would be forthcoming in such a <br />situation. <br />Commissioner Blank inquired if this matter should be revisited in 60 to 90 days to review <br />such things as automatic shut-offs, actual routing, what is contained in the pipes, and <br />what is the actual pressure. <br />Chief Miguel replied that he cannot say if PG&E will be available to talk within the next <br />30 to 60 days but that when the research is done, the LPFD staff can prepare a report <br />for the Commission and/or return with another presentation. <br />The Commission thanked both Fire Chief Miguel and Deputy Fire Chief Rodondi. <br />5. CONSENT CALENDAR <br />a. PCUP-279, Christ Church <br />Application for a Conditional Use Permit to operate a religious facility at <br />7020 Koll Center Parkway, Suite 110. Zoning for the property is <br />PUD-I/C-O (Planned Unit Development – Industrial/Commercial-Office) <br />District. <br />Commissioner Blank requested that the additional condition presented in the staff <br />memo dated September 15, 2010 be included in Exhibit A, Conditions of Approval. <br />Commissioner O’Connor moved to make the conditional use findings as listed in <br />the staff report and to approve Case PCUP-279, subject to the Conditions of <br />Approval presented in Exhibit A of the staff report, with the addition of the <br />condition in the staff memo dated September 15, 2010. <br />Commissioner Pearce seconded the motion. <br />PLANNING COMMISSION MINUTES, September 15, 2010 Page 5 of 23 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.