Laserfiche WebLink
case, and that the project developer agrees and acknowledges that building permit ap- <br />proval may be withheld if sewer capacity is found by the City not to be available. <br />10. This approval does not guarantee the availability of sufficient water to serve the project. <br />The City shall withhold building permits for the project if at the time building permits are <br />applied for, mandatory water rationing is in effect, unless the City has adopted a water <br />offset program and unless the project developer is participating in the program. Notwith- <br />standing the project developer's participation in such a program, the City may withhold <br />building permits if the City determines that sufficient water is not available at the time of <br />application of building permits. <br />11. The building permit plan check materials will be accepted for submittal only after com- <br />pletion of the fifteen- (15) day appeal period, measured from the date of the approval let- <br />ter, unless the project developer submits a signed statement acknowledging that the plan <br />check fees may be forfeited in the event that the approval is overturned on appeal, or that <br />the design is significantly changed as a result of the appeal. In no case will a building <br />permit be issued prior to the expiration of the fifteen (15) day time-period. <br />12. The project developer shall submit a waste generation disposal and diversion plan to the <br />Building Department prior to issuance of building or demolition permits. The plan shall <br />include the estimated composition and quantities of waste to be generated and how the <br />project developer shall recycle at least fifty percent (50%) of the job site construction and <br />demolition waste. Proof of compliance shall be provided to the Director of Building In- <br />spection prior to the issuance of a final building permit. During demolition and construc- <br />tion, the project developer shall mark all trash disposal bins "trash materials only" and all <br />recycling bins "recycling materials only". The project developer shall contact Pleasanton <br />Garbage Service for all waste disposal. Only that portion of trash and recycling waste re- <br />fused by Pleasanton Garbage Service shall be disposed of or diverted by another <br />trash/recycling company. <br />13. Prior to issuance of permits by the City, the project developer shall submit an application <br />for a lot line adjustment to move the existing southerly property line of the proposed of- <br />fice site to the new location shown on the site plan. <br />14. The building owner shall provide memberships to the tenants of the building covered by <br />this approval to the gymnasium facilities provided by the Bernal Corporate Park for its <br />business owners and tenants. <br />15. The project developer shall implement the following trip reduction measures on an ongo- <br />ing basis for all building tenants: <br />a. Ensure that the building's tenants stagger work hours so that employees' arri- <br />val/depart-ure times are outside the a.m./p.m. peak commute hours, to the greatest <br />extent feasible. <br />_. <br />PUD-80-2J 7D, Planning Commrssron June 26, 2002 Page 2 of 12 <br />