Laserfiche WebLink
o The Time /Tonnage Axis: Waste management economics are driven primarily by <br />factors of tonnage and time; <br />o Measures to maximize tonnage and minimize the amount of time needed to <br />deliver each payload to its final destination will be recommended. <br />Subtask 2 -E Tracking & Selling of Recyclables <br />• Determine and review tracking of recyclable materials; <br />• Report Inventory Management and Commodity Sales Procedures <br />• Review Inventory Management System <br />o Unprocessed materials; <br />o Processed materials; <br />o Shipped materials. <br />• Review Commodity Sales Protocol <br />o How and to whom commodities are offered for sale. <br />o Review process for selling recyclable materials; <br />• Evaluate results for selling recyclable materials; <br />• Compare results to current industry standards. <br />S loanvAzq u EZ,I tr <br />Task 3: Review Operations of the New Material Conveyor System <br />Sloan Vazquez will review the operations related to new material conveyor system including processing, <br />capturing, tracking and making recyclable material available for resale, staffing, and maintenance. <br />Subtask 3 -A Materials Processing <br />• Evaluate component parts of the conveyor system <br />o Loaders; <br />o Conveyors; <br />o Screens; <br />o Air Classifiers; <br />o Bins; <br />o Transfer equipment and vehicles. <br />Subtask 3 -B Capturing of Materials <br />• Evaluate effectiveness of equipment and machinery used in the system to: <br />o Sort materials to desired categories; <br />o Store materials appropriately for resale; <br />o Reduce labor costs; <br />o Improve safety for labor involved in sorting. <br />Prepared for the City of Pleasanton Revised Scope of Work & Fee Schedule to Provide Consultant <br />November 26, 2010 Services Related to Refuse and Recycling Services <br />9 <br />