My WebLink
|
Help
|
About
|
Sign Out
ORD 2014
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
11/23/2010 1:30:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
11/16/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2014
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the westerly line of the PSE and the face of the buildings. The exact location shall be <br />approved by the City Engineer. <br />53. Each of the buildings water service and the irrigation water service within the project <br />shall be served with a separate water service from the City's water main in the street, <br />including backflow device. The project applicant or developer may install the services <br />from a manifold from a larger lateral crossing the public street. The exaction locations of <br />the water services shall be shown on the improvement plans and to be approved by the <br />City Engineer. <br />54. The design of the on -site sanitary sewer system shall be modified such that that the size <br />and slope of the sanitary sewer main maintain a minimum velocity of two -feet per <br />second unless otherwise approved by the City Engineer. A sanitary sewer lateral with <br />sampling manhole shall be provided to each building within both phases of the <br />development unless otherwise approved by the City Engineer. <br />55. Unless otherwise determined by the City Engineer, the sanitary sewer line serving the <br />Phase I Major Tenant #1 building and Building Pads #1, #2 and #4 along Bernal Avenue <br />shall tie into the six -inch lateral stubbed to the site on Bernal Avenue; the sanitary sewer <br />main in front of the Phase I Building Pad 3 and Shops Building #4 shall be eliminated; <br />and a new sewer main shall be installed between the Phase I Building Pad #3 and Major <br />Tenant #2 and shall connect to the sewer main fronting Major Tenant #2. <br />56. All restaurant/food preparation uses shall install a grease interceptor on the building <br />sewer lateral. This detail shall be shown on all building permits and /or tenant <br />improvement permits to the satisfaction of the City Engineer. <br />57. The proposed main storm drain line along the westerly side of the development within <br />the Phase II portion of the project shall be constructed with the Phase I improvements. <br />58. A detailed grading and drainage plan prepared by a licensed Civil Engineer including all <br />supporting information and design criteria, storm drain treatment calculations, and <br />hydromodification worksheets, etc., shall be submitted with the Phase I improvements. <br />The calculations shall demonstrate to the satisfaction of the City Engineer that there is <br />sufficient capacity within the existing detention pond on the Bernal Property to allow for <br />both hydromodification and storm water treatment for both the future development of <br />Bernal Park and Phase I and II of this development. Prior to the first plan check, the <br />project applicant or developer's engineer shall submit the storm drain drawings and <br />hydromodification calculations to the City Engineer for review. The hydromodification <br />calculations shall be peer reviewed by the City's consultant, with the peer review costs <br />paid for by the project applicant or developer subject to the peer review procedures <br />established by the City Engineer. <br />59. Based upon the storm drainage analysis required in Condition No. 55, subject to the <br />review and approval by the City Engineer, the project applicant or developer shall be <br />responsible for making any modification to the existing detention pond for any additional <br />storage including any modifications of the existing outfall to allow sufficient capacity for <br />stormwater treatment and hydromodification. <br />60. The site plan layout is conceptually acceptable at this time for Phase I; the project <br />applicant or developer shall provide calculations to show the stormwater treatment <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.