My WebLink
|
Help
|
About
|
Sign Out
ORD 2014
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
11/23/2010 1:30:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
11/16/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2014
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provide a through lane, a shared through /right lane, and a right -turn only lane. <br />Construction and occupancy of Phase 1 (commercial /retail section) is allowed to <br />proceed absent widening the entrance ramp. The project applicant or <br />developer shall obtain permit approval from CalTrans for the ramp widening <br />before the issuance of the first Phase II (office section) building permit. <br />• Bernal Avenue/Valley Avenue Intersection <br />The project applicant or developer shall convert the eastbound /northbound <br />right -turn lane to a shared through /right -turn lane; widen the existing <br />westbound/ southbound left -turn lane from one- to two - lanes; and modify all <br />traffic signal equipment to account for these improvements as directed by the <br />City Traffic Engineer. Construction of the double left -turn lane shall not result <br />in the removal of any existing Heritage -size tree presently in the Bernal Avenue <br />median island. <br />d) With construction of Phase 1 and Phase 11: <br />• Traffic Impact Fees <br />With the issuance of each building permit(s), the project applicant or developer <br />shall pay the City's Traffic Impact Fee towards new signals at the intersections <br />of Valley Avenue /Koll Center Parkway (South), Bernal Avenue /Main Street, <br />Valley Avenue /Paseo Santa Cruz (South), Valley Avenue /Paseo Santa Cruz <br />(North), and the Valley Avenue /Santa Rita Road. The project applicant or <br />developer shall be credited for all previous payment of impact fees. <br />50. The project applicant or developer will work with the City of Pleasanton to develop a <br />neighborhood traffic calming program to identify locations where traffic calming devices <br />consistent with those outlined in the City of Pleasanton Neighborhood Traffic Calming <br />Program (NTCP) would be appropriate if studies completed after the project — Phase 1 <br />and Phase 11 — is in operation shows significant cut - through traffic through the adjoining <br />residential neighborhood. The total cost of the measures shall not exceed $50,000. <br />Engineering Requirements <br />51. The project applicant or developer shall install an eight -foot wide meandering <br />(separated) concrete sidewalk/bike path along the Valley Avenue frontage between <br />Bernal Avenue and the first project driveway entrance south of Bernal Avenue. The <br />planter strip between the back of curb and face of sidewalk shall be a minimum of four <br />feet. From the first driveway entrance proceeding southerly to the southerly limit of the <br />project site, the sidewalk shall be monolithic to the back of curb. With the Phase 1 <br />construction, the sidewalk shall extend from Bernal Avenue south to the crosswalk on <br />the far side of the first roundabout located southerly of Bernal Avenue. With the Phase 11 <br />construction, the sidewalk shall be extended southerly to the southerly limit of the project <br />site. If the project applicant or developer installs a City standard sidewalk along the <br />project frontage and dedicates an easement for the maintenance of the sidewalk, the <br />City will accept the sidewalk for maintenance, however it the sidewalk is not in <br />conformance with City standard the sidewalk shall be privately maintained by the project <br />maintenance association. <br />52. The relocated San Francisco Water main shown to be placed between Valley Avenue <br />and the proposed buildings shall be placed outside the City's Public Service Easement <br />(PSE). The easements may overlap but the pipeline shall be located halfway between <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.