Laserfiche WebLink
facilities are in conformance with the California Regional Water Quality Control Board, <br />San Francisco Region, Municipal Regional Stormwater NPDES Permit, Order R2 -2009- <br />0074, NPDES Permit No. CAS612008, October 14, 2009. Said treatment facilities shall <br />include the provisions for trash removal device(s) within the storm drain system. The <br />site plan layout of stormwater treatment facilities for Phase!! is not approved at this time, <br />and shall be resubmitted with the Phase! stormwater treatment facilities plans. <br />61. The fire protection water main shall be private beyond the backflow prevention device. <br />The fire protection system shall have an additional connection to the City water main in <br />Valley Avenue to accommodate the Phase 11 improvements. The private on -site fire <br />water system shall be approved by the Fire Marshall after reviewing the layout and <br />calculations submitted by the project applicant or developer with the improvement plans. <br />62. With construction of Phase 11, the project applicant or developer shall provide an <br />underground electrical service to the Caltrans sign located on the east side of 1 -680 <br />southerly of the northbound 1- 680 /Bernal Avenue exit ramp and shall work with Caltrans <br />to remove the existing overhead electrical service that presently crosses the freeway. <br />The work shall be started with the Phase 11 construction and shall be completed prior to <br />the acceptance of the Phase 11 improvements. An easement for the electrical service <br />shall be dedicated to the electrical utility by separate instrument. <br />63. The project applicant or developer shall provide for cross easements in perpetuity for <br />storm water (drainage), access, emergency vehicles, water, sewer, landscaping, and <br />parking between Phase 1 and Phase 11. These easements shall be shown on the first <br />parcel or subdivision map submitted for subdividing the property and shall be recorded <br />concurrently with the sale of the property affected by these easements. <br />64. The existing 18 -inch storm drain stubbed to the property on Bernal Avenue shall be <br />abandoned per City standard requirements unless otherwise approved by the City <br />Engineer. <br />65. The project applicant or developer shall be responsible for paying applicable Zone 7 <br />drainage fees minus all previous payments and credits. <br />SPECIAL CONDITIONS OF APPROVAL <br />Fire <br />(Project applicant or developers are responsible for complying with all applicable Federal, State <br />and City codes and regulations regardless of whether or not the requirements are part of this <br />list. The following items are provided for the purpose of highlighting key requirements.) <br />66. All Phase 1 and Phase 11 construction shall conform to the requirements of the 2007 <br />California Fire Code, City of Pleasanton Ordinance 1965. The project applicant or <br />developer shall obtain all required permits from the Fire Department before construction <br />begins. <br />67. The Phase II Buildings 1, 2, and 3 shall provide exterior access to the roof level in <br />compliance with the Fire Code. <br />20 <br />