My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
111610
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 2:49:07 PM
Creation date
11/10/2010 2:49:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/16/2010
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the point is located. All proposed green building measures shall be shown throughout <br /> the plan set as determined by the Planning Division. Notwithstanding the foregoing, the <br /> State of California's Green Building Standards Code, "CALGreen ", as amended, shall <br /> apply if the building permit application is submitted after January 1, 2011. <br /> 25. In conjunction with the building permit application, the project applicant or developer <br /> shall determine the building's "LEED Green Building Rating ", using the USGBC <br /> evaluating methodology, and shall report the rating to the Planning Division. Prior to <br /> building permit issuance, the green building provisions that are proposed to be included <br /> in the development and the LEED scorecard shall be submitted to the Planning Division <br /> for review and comment. All of the green building measures indicated on the approved <br /> checklist shall be inspected and approved by either the City of Pleasanton, a third party <br /> rater, or the project applicant or developer shall provide written verification by the project <br /> engineer, architect, landscape architect, or designer. Notwithstanding the foregoing, the <br /> State of California's Green Building Standards Code, "CALGreen ", as amended, shall <br /> apply if the building permit application is submitted after January 1, 2011. <br /> 26. For Phase II, the project applicant or developer shall extend electrical conduits and pull <br /> strings to safely serve the parking spaces closest to the main entrances of Buildings 1 <br /> through 7 on Exhibit B for electrically powered commute vehicles. (Pleasanton General <br /> Plan, Program 6.3, Best Management Practice #6). Upon demand by the Planning <br /> Division, the owner(s) of these buildings shall have 30 -days to install the charging <br /> equipment for some or all of the spaces, and shall provide evidence to the Planning <br /> Division that the installation is complete. The project applicant or developer shall install <br /> with the Phase II buildings signs for the subject parking spaces stating, "Electrical <br /> Vehicle Chargers Shall Be Provided Upon Request of the Pleasanton Planning Division." <br /> When the charging facilities are installed, the signs shall be changed to state, "Parking <br /> for Electrical Vehicles Only, Contact Building Owner for More Information ". These <br /> changes shall be shown on the building permit set submitted for review and approval by <br /> the Planning Division before issuance of a building permit. <br /> 27. For Phase I, the Director of Community Development and the applicant shall explore the <br /> feasibility of installing conduits and pull strings for electrically powered vehicles to safely <br /> serve the parking spaces on the north or the south sides of the Major Tenant #1 building. <br /> The location and number of parking spaces, if feasible, shall be made before issuance of <br /> the building permit for the Major Tenant #1 building. If provided, this change shall be <br /> shown on the building permit set to the satisfaction of the Director of Community <br /> Development. <br /> 28. The Phase I Major Tenant #1 building and the Phase II Buildings 1 through 7 shall be <br /> constructed to allow for the future installation of a photovoltaic system. (Pleasanton <br /> General Plan, Program 6.3, Best Management Practice #3). The project applicant or <br /> developer shall comply with the following requirements for making these buildings <br /> photovoltaic ready: <br /> a) Electrical conduit and cable pull strings shall be installed from the roof area to the <br /> buildings' main electrical panels; <br /> b) An area shall be provided near the electrical panel for the installation of an <br /> "inverter" required to convert the direct current output from the photovoltaic panels <br /> to alternating current; <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.