Laserfiche WebLink
• The architectural theme of the proposed development is a combination of Arts and <br /> Crafts and Main Street, Pleasanton design elements, such as reclaimed timber, <br /> wood siding, prairie -style and gooseneck lamps, brick and limestone masonry, black <br /> and champagne - colored aluminum door /window frames, and green metal roof <br /> areas. <br /> • Building colors are predominantly earth tones with a variety of body and trim colors. <br /> • Common design elements of materials, design details, and forms visually link the <br /> individual buildings while at the same time achieving the individual buildings' design <br /> identity <br /> • The building designs provide significant articulation and variation of building heights, <br /> volumes, and massing. <br /> • The buildings are designed with four -sided architectural design massing and <br /> detailing on all building sides, and with design details and elements that establish a <br /> "pedestrian scale" to the overall building designs. <br /> Large -size building material and color boards will be presented to the Planning <br /> Commission at the Planning Commission hearing. <br /> The Planning Commission requested a comparison of the proposed Safeway building floor <br /> area — 58,000 square feet — to comparable Safeway stores in the Tri- Valley area. Table 3, <br /> below, provides the building floor areas for five Safeway grocery stores in Pleasanton, <br /> Dublin, Livermore, and San Ramon. <br /> Table 3: Comparison of the Proposed Safeway Grocery Store to <br /> Five Safeway Stores in the Tri - Valley Area. <br /> Safeway Store Location Buildin • Floor Area <br /> Pleasanton, #1502 1701 Santa Rita Road 52,256 s. uare feet <br /> Dublin, #1932 4440 Tassajara Ftoad 53,156 seuare feet <br /> Dublin, #1953 7499 Dublin Boulevard 55,256 se uare feet <br /> Livermore, #1257 4495 First Street 62,868 s.uare feet <br /> San Ramon, #2712 11050 Bollinger Can on 67,873 square feet <br /> As conditioned, all HVAC equipment will be located within the buildings' roof - equipment <br /> wells projecting no higher than a horizontal plane defined by the top -edge of the equipment <br /> screens /parapet walls. Exhibit D includes a section through Safeway from 1 -680. Final <br /> determination of the freeway screening of the HVAC equipment for the Major Tenant #1 <br /> building will be made with the Planning Division's review of the building permit. However, <br /> to provide flexibility, staff has conditioned Safeway's maximum building height at the <br /> freeway side from 26 feet to 28 feet. <br /> Building and Site Signs <br /> All site and building signage is conditioned to be reviewed by staff under a separate <br /> application for a comprehensive sign program. As conditioned, the PUD development plan <br /> will establish general specifications for the site /building signs as follows: <br /> Pleasanton Gateway Page 20 of 35 August 25, 2010 <br />