Laserfiche WebLink
Pleasanton Gateway- Environmental Checklist <br /> development thereby ensuring sufficient water supplies to serve the project. <br /> Therefore, this would be a less than - significant impact. <br /> c) New stormwater drainage facilities will be constructed on the project site as part of <br /> the project. Stormwater pre- treatment will be implemented on the project site <br /> through a combination of bio- swales and artificial treatment devices. The treated <br /> stormwater will then be piped to the City's storm water detention /retention ponds <br /> on the adjoining City property to further treat the stormwater before its entry into <br /> the Arroyo De Las Laguna. These ponds were constructedin conjunction with the <br /> first phase of the Bernal property Specific plan and will sized to accommodate the <br /> stormwater runoff from the Pleasanton Gateway property. Therefore, this would <br /> be a less than - significant impact. <br /> 17. MANDATORY FINDINGS OF SIGNIFICANCE <br /> Less Than <br /> Significant <br /> Potentially Impact With Less Than <br /> Significant Mitigation Significant No <br /> Issues Impact Incorporated Impact Impact <br /> Mandatory Findings of Significance <br /> Would the project: <br /> a) Does the project have the potential to degrade the X LJ <br /> quality of the environment, substantially reduce the <br /> habitat of a fish or wildlife species, cause a fish or <br /> wildlife population to drop below self- sustaining levels, <br /> threaten to eliminate a plant or animal community, <br /> reduce the number or restrict the range of a rare or <br /> endangered plant or animal or eliminate important <br /> examples of the major periods of California history or <br /> prehistory? <br /> b) Does the project have impacts that are individually 1 LXJ <br /> limited, but cumulatively considerable? ( "Cumulatively <br /> considerable" means that the incrernental effects of a <br /> project are considerable when viewed in connection <br /> with the effects of past projects, the effects of other <br /> current projects, and the effects of probable future <br /> projects)? <br /> c) Does the project have environmental effects, which L] 1 1 X <br /> will cause substantial adverse effects on human <br /> beings, either directly or indirectly? <br /> Discussion <br /> The proposed project is an infill office /commercial proposal in the area covered by the <br /> Bernal Property Specific Plain, PUD Development Plan, Final Environmental Impact <br /> Report, and Development Agreement. These plans and agreements will be amended <br /> and /or modified to change the entitlements for this site including uses, building and site <br /> design, and the requirements applicable to this development. <br /> Page 51 of 52 Pleasanton Gateway Initial Study August 2, 2010 <br />