Laserfiche WebLink
Pleasanton Gateway- Environmental Checklist <br /> g) Bicycle racks will be conditioned to be provided with this development. Therefore, <br /> this would be a less - than - significant impact. <br /> 16. UTILITIES AND SERVICE SYSTEMS <br /> Environmental Setting <br /> The City of Pleasanton has public services and infrastructure planned to meet the build out <br /> of the 2005 — 2025 Pleasanton General Plan', implemented by the Growth Management <br /> Plan. <br /> Standards of Significance <br /> For purposes of this environmental document, an impact is considered significant if the <br /> proposed project would: <br /> • Result in the construction of new water facilities or expansion of existing facilities; <br /> • Result in exceeding the wastewater treatment requirements of the Regional Water <br /> Quality Control Board; <br /> • Result in or require the construction or expansion of existing wastewater treatment <br /> facilities; and, <br /> • Be served by a landfill that has inadequate permitted capacity. <br /> Less Than <br /> Significant <br /> Potentially Impact With Less Than <br /> Significant Mitigation Significant No <br /> Issues Impact Incorporated Impact Impact <br /> Utilities and Service Systems <br /> Would the project: <br /> a) Exceed wastewater treatment requirements of the _j X <br /> applicable Regional Water Quality Control Board? <br /> b) Require or result in the construction of new water or [ rk L <br /> wastewater treatment facilities or expansion of existing <br /> facilities, the construction of which could cause <br /> significant environmental effects? <br /> c) Require or result in the construction of new [] L� LIl <br /> stormwater drainage facilities or expansion of existing <br /> facilities, the construction of which could cause <br /> significant environmental effects? <br /> d) Have sufficient water supplies available to serve the [l x L <br /> project from existing entitlements and resources, or <br /> are new or expanded entitlernents needed? <br /> Discussion <br /> a,b,d) The proposed project consisting of office /commercial uses will not exceed <br /> projected wastewater treatment requirements. The applicant has reserved water <br /> capacity through the previous purchase of eight, two -inch water meters for the <br /> Page 50 of 52 Pleasanton Gateway Initial Study August 2, 2010 <br />