My WebLink
|
Help
|
About
|
Sign Out
13 ATTACHMENT 03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
101910
>
13 ATTACHMENT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2010 11:24:59 AM
Creation date
10/14/2010 11:24:53 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/19/2010
DESTRUCT DATE
15Y
DOCUMENT NO
13 ATTACHMENTS 03
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton Gateway- Environmental Checklist <br /> g) Bicycle racks will be conditioned to be provided with this development. Therefore, <br /> this would be a less - than - significant impact. <br /> 16. UTILITIES AND SERVICE SYSTEMS <br /> Environmental Setting <br /> The City of Pleasanton has public services and infrastructure planned to meet the build out <br /> of the 2005 — 2025 Pleasanton General Plan', implemented by the Growth Management <br /> Plan. <br /> Standards of Significance <br /> For purposes of this environmental document, an impact is considered significant if the <br /> proposed project would: <br /> • Result in the construction of new water facilities or expansion of existing facilities; <br /> • Result in exceeding the wastewater treatment requirements of the Regional Water <br /> Quality Control Board; <br /> • Result in or require the construction or expansion of existing wastewater treatment <br /> facilities; and, <br /> • Be served by a landfill that has inadequate permitted capacity. <br /> Less Than <br /> Significant <br /> Potentially Impact With Less Than <br /> Significant Mitigation Significant No <br /> Issues Impact Incorporated Impact Impact <br /> Utilities and Service Systems <br /> Would the project: <br /> a) Exceed wastewater treatment requirements of the _j X <br /> applicable Regional Water Quality Control Board? <br /> b) Require or result in the construction of new water or [ rk L <br /> wastewater treatment facilities or expansion of existing <br /> facilities, the construction of which could cause <br /> significant environmental effects? <br /> c) Require or result in the construction of new [] L� LIl <br /> stormwater drainage facilities or expansion of existing <br /> facilities, the construction of which could cause <br /> significant environmental effects? <br /> d) Have sufficient water supplies available to serve the [l x L <br /> project from existing entitlements and resources, or <br /> are new or expanded entitlernents needed? <br /> Discussion <br /> a,b,d) The proposed project consisting of office /commercial uses will not exceed <br /> projected wastewater treatment requirements. The applicant has reserved water <br /> capacity through the previous purchase of eight, two -inch water meters for the <br /> Page 50 of 52 Pleasanton Gateway Initial Study August 2, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.