My WebLink
|
Help
|
About
|
Sign Out
13 ATTACHMENT 03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
101910
>
13 ATTACHMENT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2010 11:24:59 AM
Creation date
10/14/2010 11:24:53 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/19/2010
DESTRUCT DATE
15Y
DOCUMENT NO
13 ATTACHMENTS 03
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton Gateway— Environmental Checklist <br /> construction and implementation phases of the project. Grading is prohibited from <br /> October 15 to April 1 to reduce Citywide impacts. Therefore, this would be a less - <br /> than- significant- impact. <br /> c) The site is composed of fill material stabilized to the standards of the California <br /> Building Code and, therefore, is not anticipated to fail. Therefore, this would be <br /> considered no- impact. <br /> e) The project will be connected to the sanitary sewer system. Therefore, this would <br /> be considered no- impact. <br /> 7. HAZARDS AND HAZARDOUS MATERIALS <br /> Environmental Setting <br /> The project site is a flat, vacant property situated entirely within an established business <br /> park in the City. It can be considered an infill property. <br /> Standards of Significance <br /> For purposes of this environmental document, an impact is considered significant if the <br /> proposed project would: <br /> • Result in exposing people to existing contaminated soil during construction <br /> activities; <br /> • Result in exposing people to asbestos containing materials; <br /> • Result in exposing people to contaminated groundwater if dewatering activities take <br /> place. <br /> Less Than <br /> Significant <br /> Potentially Impact With Less Than <br /> Significant Mitigation Significant No <br /> Issues Impact Incorporated Impact Impact <br /> Hazards And Hazardous Materials <br /> Would the project: <br /> a) Create a significant hazard to the public or the El 1 X �� <br /> environment through the routine transport, use, or <br /> disposal of hazardous materials? <br /> b) Create a significant hazard to the public or the 1 X P1 <br /> environment through reasonably foreseeable upset <br /> and accident conditions involving the release of <br /> hazardous materials into the environment? <br /> c) Emit hazardous emissions or handle hazardous or ] 1 <br /> acutely hazardous materials, substances, or waste <br /> with -in one - quarter mile of an existing or proposed <br /> school? <br /> Page 34 of 52 Pleasanton Gateway Initial Study August 2, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.