Laserfiche WebLink
28. The project applicant or developer for Phase 1 and /or for Phase 11 shall provide to the <br /> Planning Division with the first building permit for Phase 1 or for Phase II an estimate of <br /> the energy savings from the installation of solar roofs or other alternative energy <br /> measures with a goal of meeting 12.5 percent of the buildings' annual energy useage. <br /> (Pleasanton General Plan, Program 6.3, Best Management Practice #3). <br /> 29. All exterior building, site, and landscaping lighting shall be designed, installed, and <br /> controlled so as not to shine onto the 1 -680 freeway right -of -way, Bernal Avenue, and <br /> Valley Avenue. (This condition shall not apply to the buildings' interior lighting for both <br /> development phases.) The bulbs for the gooseneck fixtures on the Phase 1 buildings <br /> shall be recessed into the fixture and diffused. The project applicant or developer shall <br /> submit a final lighting plan with drawings and /or manufacture's specification sheets <br /> showing the size and types of light fixtures proposed for the buildings' exteriors and for <br /> the site and parking areas. The Tight fixtures and their locations shall be subject to the <br /> review and approval of the Planning Division. <br /> Landscape Design <br /> 30. The project applicant or developer for Phase 1 and for Phase II shall comply with the <br /> State of California's Model Water Efficient Landscape Ordinance. A licensed landscape <br /> architect shall work with the City's Landscape Architect to verify the compliance of <br /> Phase 1 and Phase 11 with the ordinance prior to the issuance of a building permit, and <br /> then prior to the final inspection conducted by the Planning Division. The verifications <br /> shall be provided to the Planning Division. <br /> 31. Before the buildings and project final for Phase 1 and Phase 11, all landscaping shall be <br /> installed, reviewed, and approved by the Planning Division. <br /> 32. The project applicant or developer shall arrange the plantings along the 1/680 freeway <br /> and Bernal Avenue project frontages in clusters and groupings that achieve a varied <br /> appearance in terms of heights and density, which hide drive - through lanes and service <br /> areas, and which soften and frame the views of the site and of the buildings from the <br /> freeway and exit ramp, with an emphasis on breaking up the mass of the Safeway <br /> building. This change shall be shown on a project -wide landscape plan for this area, <br /> submitted with the first building permit application for review and approval by the <br /> Planning Division before issuance of a building permit. <br /> 33. The project applicant or developer shall preserve the existing sycamore trees along the <br /> Bernal Avenue project frontage from construction damage. Prior to issuance of a <br /> grading or building permit, the project applicant or developer shall install a temporary six - <br /> foot tall chain -link fence or other fence type acceptable to the Planning Division along <br /> the existing tree drip lines. The fencing shall remain in place until final landscape <br /> inspection by the Planning Division; removal of such fencing prior to that time shall result <br /> in a "stop work" order. No construction workers or equipment shall be allowed into the <br /> fenced areas for these trees unless prior written approval is issued by the City's <br /> Landscape Architect. Failure to comply with this requirement shall also result in a "stop <br /> work" order. <br /> 34. The project applicant or developer shall coordinate the landscape design of the parking <br /> area between Office Building #2 and the southerly property line with the design of the <br /> planned City park property for a seamless transition between these areas. To achieve <br /> 7 <br />