Laserfiche WebLink
the point is located. All proposed green building measures shall be shown throughout <br /> the plan set as determined by the Planning Division. Notwithstanding the foregoing, the <br /> State of California's Green Building Standards Code, "CALGreen ", as amended, shall <br /> apply if the building permit application is submitted after January 1, 2011. <br /> 25. In conjunction with the building permit application, the project applicant or developer <br /> shall determine the building's "LEED Green Building Rating ", using the USGBC <br /> evaluating methodology, and shall report the rating to the Planning Division. Prior to <br /> building permit issuance, the green building provisions that are proposed to be included <br /> in the development and the LEED scorecard shall be submitted to the Planning Division <br /> for review and comment. All of the green building measures indicated on the approved <br /> checklist shall be inspected and approved by either the City of Pleasanton, a third party <br /> rater, or the project applicant or developer shall provide written verification by the project <br /> engineer, architect, landscape architect, or designer. Notwithstanding the foregoing, the <br /> State of California's Green Building Standards Code, "CALGreen ", as amended, shall <br /> apply if the building permit application is submitted after January 1, 2011. <br /> 26. The project applicant or developer shall extend electrical conduits and pull strings to the <br /> parking spaces closest to the main entrances of the Phase II Buildings 1 through 7 on <br /> Exhibit B for electrically powered commute vehicles. (Pleasanton General Plan, <br /> Program 6.3, Best Management Practice #6). Upon demand by the Planning Division, <br /> the owner(s) of these buildings shall have 30 -days to install the charging equipment for <br /> some or all of the spaces, and shall provide evidence to the Planning Division that the <br /> installation is complete. The project applicant or developer shall install with the Phase II <br /> buildings signs for the subject parking spaces stating, "Electrical Vehicle Chargers Shall <br /> Be Provided Upon Request of the Pleasanton Planning Division." When the charging <br /> facilities are installed, the signs shall be changed to state, "Parking for Electrical <br /> Vehicles Only, Contact Building Owner for More Information ". These changes shall be <br /> shown on the building permit set submitted for review and approval by the Planning <br /> Division before issuance of a building permit. <br /> 27. The Phase I Major Tenant #1 building and the Phase II Buildings 1 through 7 shall be <br /> constructed to allow for the future installation of a photovoltaic system. (Pleasanton <br /> General Plan, Program 6.3, Best Management Practice #3). The project applicant or <br /> developer shall comply with the following requirements for making these buildings <br /> photovoltaic ready: <br /> a) Electrical conduit and cable pull strings shall be installed from the roof area to the <br /> buildings' main electrical panels; <br /> b) An area shall be provided near the electrical panel for the installation of an <br /> "inverter" required to convert the direct current output from the photovoltaic panels <br /> to alternating current; and, <br /> c. The roof structure shall be designed to handle an additional load of five - pounds per <br /> square foot beyond that anticipated for the roofing materials. <br /> d. A bi- directional electrical meter shall be installed upon approval of the public utility. <br /> These measures shall be shown on the building permit plan set submitted to the <br /> Planning Director for review and approval before issuance of the building permit(s. <br /> 6 <br />