My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
100510
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2010 2:33:29 PM
Creation date
9/29/2010 2:33:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/5/2010
DESTRUCT DATE
15Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
visibility of equipment including storage tanks to Franklin Drive shall be <br /> minimized to the satisfaction of the Director of Community Development; where <br /> visible above the service yard fence, the equipment and tanks shall be painted to <br /> match the building color." <br /> The applicant supports the Planning Commission's recommendation. <br /> • Detailing on the West Building Elevation: <br /> The Planning Commission requested staff to add the condition identified in the <br /> staff report addressing additional detailing on the west building elevation to <br /> achieve visual interest and to relieve the flat appearance of this elevation. <br /> Staff corrected this oversight by adding Condition 9 to the draft ordinance: "The <br /> applicant shall add detailing of the west building elevation for visual interest and <br /> to relieve the flat appearance of this elevation, such as additional spandrel glass <br /> areas applied to this elevation and /or the installation of a decorative metal <br /> architectural detail matching the design pattern of the surrounding buildings. <br /> This change shall be shown to the satisfaction of the Director of Community <br /> Development on the building permit plan set prior to the issuance of a building <br /> permit." <br /> The applicant supports the Planning Commission's recommendation. <br /> • Staggered Work Hours: <br /> The Planning Commission requested staff to clarify the absence of the previous <br /> condition for the Providian BankCorps development requiring staggered work <br /> hours. Staff replied that, as conditioned, all six buildings will now include the new <br /> TSM program requirements including performance goals. <br /> The Planning Commission was satisfied with the reply and did not add or modify <br /> the condition. <br /> Other Issues <br /> For a complete discussion of the proposal, please refer to the Planning Commission <br /> staff report (Attachment 5). A summary follows. <br /> • General Plan — The proposal conforms to the Land Use Map of the Pleasanton <br /> General Plan including maximum and midpoint floor area ratios. <br /> • Zoning — The development plan is modified to accommodate the proposed <br /> building at 64,474 square feet in a first floor /second level mezzanine <br /> configuration. <br /> • Traffic, Circulation, and Parking — At a proposed employee density of 40 <br /> employees, the proposed project will generate a negligible increase in trips the <br /> surrounding streets and intersections. There will remain 1,477 parking spaces <br /> for the six buildings, a surplus of 303 parking spaces above the requirements of <br /> the Pleasanton Municipal Code for this development and its uses. <br /> Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.