Laserfiche WebLink
h. All water service laterals shall be equipped with backflow prevention <br /> devices, unless waived by the City Engineer. The type of back flow <br /> prevention device used shall be shown on the plans, prior to the issuance of <br /> a building permit, and shall be subject to the review and approval of the City <br /> Engineer. <br /> i. Utilities to be owned and maintained by the City shall be located in a public <br /> right of way or PSE with sufficient access for maintenance. The location <br /> and width of a PSE shall be subject to the review and approval of the City <br /> Engineer prior to the recordation of a Final Map for the PUD project site or <br /> issuance of a building permit, whichever occurs first. <br /> j. Prior to the issuance of a building permit, the plans shall be revised to show <br /> separate private water mains to each building for fire sprinkler service. <br /> k. A sanitary sewer sampling manhole shall be provided on any new sanitary <br /> sewer lateral from a building with a commercial use, unless otherwise <br /> determined by the City Engineer. <br /> I. Prior to the issuance of a building permit, a typical street section shall be <br /> shown on the plans for each street (including private streets) showing how <br /> the utilities (public water, public sewer, storm drain, private water and <br /> sanitary sewer, fire mains, irrigation mains and joint trench (PG &E, AT &T, & <br /> Comcast) will be placed under the street with the required clearance <br /> between the pipes. The plans shall be subject to the review and approval of <br /> the City Engineer. <br /> m. Prior to the issuance of a building permit, the applicant shall provide a joint <br /> trench plan (PG &E, AT &T, & Comcast) including splice box, switch box and <br /> transformer locations for the City's review and comment with the <br /> improvement plan submittal. All utility boxes for PG &E, AT &T, Comcast and <br /> similar utility companies shall be installed underground, unless the entire <br /> development proposal on the property has been constructed in which case <br /> aboveground boxes may be allowed subject to the approval of a PUD <br /> modification. <br /> n. If the site is subdivided, easement for utilities, cross drainage, shared <br /> vehicle access, and shared parking may be required by the City Engineer <br /> and the Planning Manager. <br /> o. Stormwater treatment shall be required for all roof drainage. <br /> Conditions of Approval /PUD -57 <br /> General Conditions <br /> 10 <br />