Laserfiche WebLink
b. All parking spaces shall be striped. <br /> 11. Flooding. <br /> a. Prior to the recordation of a Final Map, a Conditional Letter of Map Revision <br /> (CLOMR) that indicates how the Staples Ranch Site will be removed from <br /> the floodplain shall be filed and approved by the Federal Emergency <br /> Management Agency (FEMA), and a copy of the approved CLOMR shall be <br /> provided to the City Engineer. No building permits shall be issued for <br /> development within the Staples Ranch Site until a Final Letter of Map <br /> Revision (FLOMR) has been filed and approved by FEMA, unless it can be <br /> demonstrated to the satisfaction of the City Engineer that construction of the <br /> Livermore Flood Protection improvements described in the EIR will be <br /> completed prior to occupancy of any buildings on the Staples Ranch Site. <br /> b. Prior to beginning any construction activities, hydraulic modeling for the <br /> actual Stoneridge Drive bridge designs shall be complete and demonstrate <br /> that channel flow rates, capacity, and velocities in the Arroyo Mocho are not <br /> negatively impacted and scour protection is adequately addressed. The <br /> hydraulic modeling shall be subject to the review and approval of the City <br /> Engineer. The ACSPA shall be responsible for the hydraulic modeling. <br /> 12. Water and Sewer Utilities. <br /> a. The public water line main loop shall be a minimum of 12 inches in <br /> diameter. <br /> b. The public sanitary line main loop shall be a minimum of eight inches in <br /> diameter. <br /> c. The applicant shall attempt to achieve a public sanitary sewer pipe slope of <br /> 0.005 (0.5 percent) with a velocity of 2.0% per second. A slope of <br /> 0.003 (0.3 percent) is acceptable, if necessary to meet site conditions. <br /> d. The applicant shall attempt to achieve a gutter slope of 0.75 percent. <br /> e. Each parcel shall have a separate water meter, unless waived by the City <br /> Engineer. <br /> f. With the exception of the public water line loop and sewer line loop, all <br /> water and sewer lines on site shall be private laterals. The laterals shall tie <br /> into the public water and sewer lines. <br /> g. All private sewer and water laterals shall be marked "private ". The location <br /> of the markings shall be subject to the review and approval of the City <br /> Engineer prior to the issuance of a building permit. <br /> Conditions of Approval /PUD -57 <br /> General Conditions <br /> 9 <br />