Laserfiche WebLink
sus ` phase at a local facility. The meeting will provide information on the project features, design alternatives, <br /> 6 landscaping plan and construction schedule. <br /> The BKF Project Team can assist City staff in preparing materials to announce meeting (website, flyers, <br /> etc.) and will prepare the exhibits to facilitate discussion. BKF will prepare a Project Information Sheet, <br /> sign -in sheets and comment cards, and record public comments and coordinate responses and, if the City <br /> chooses the BKF Project Team, can facilitate the meeting. <br /> Deliverables: <br /> Geometric Alternative Drawings Geometric Exhibit <br /> Design Checklist (DIB78) Landscape Plan <br /> Design Exception Fact Sheets Public Meeting Supportive Information <br /> Task 4 Initial Encroachment Permit (95% PS &E) Submittal — Duration 3 months concurrent <br /> with Task 2 <br /> All components of the final design plans, special provisions and estimate will be included during this task. <br /> With the establishment and review of the geometric design and vertical alignments, design will be <br /> production- oriented for preparation of project plans. Reports supporting the design have been prepared in <br /> the preliminary phases of work, have been drafted and can be submitted with the initial encroachment permit <br /> submittal. The plans will be developed to a 95% level in order to obtain a thorough review from Caltrans and <br /> to facilitate the encroachment permit approval process. Development of the following plans and reports will <br /> be performed during this phase in order to provide to the City and Caltrans the initial encroachment permit <br /> submittal: <br /> Highway Plan Sheets — BKF will prepare, coordinate and submit design plan sheets in imperial units for all <br /> highway and roadway design, and assure that interface information is provided to the other design <br /> consultants. The following drawings will be in AutoCad format, convertible to Microstation CADD, and <br /> will be in compliance with Caltrans' current CADD Users Manual and current Drafting and Plans Manual: <br /> Title Sheet will be prepared to provide an overview of the project limits and an index of project sheets. <br /> Layout Sheets will be prepared on 50' scale plan sheets. Skeleton base sheets will include basic <br /> horizontal and vertical layout information and identify all major construction features. These sheets will <br /> include the topographic base mapping provided by Caltrans. Retaining wall design will also be delineated <br /> on the layout sheets. <br /> Typical Cross Sections for the highway will be based on the approved standard sections, including <br /> pavement structural sections. <br /> Profile Sheets will be prepared at a 50' horizontal and 5' vertical scale and shall include superelevations. <br /> Drainage Sheets will be prepared on 50' scale plan sheets and will identify modifications, locations of <br /> structures and subsurface features. Elevations and details will be provided in order to establish the <br /> construction of the drainage features. In addition to the drainage plans, drainage calculations based on a <br /> 25 -year event storm will be developed for submission and approval. <br /> Utility Relocation /Occupation Plans BKF will identify and propose final locations of all utilities that are <br /> affected by the Project (e.g. water, sewer, gas, electric, cable TV, telephone) on 50' scale plan sheets. <br /> The respective owners will conduct relocation of gas, electric, cable TV and telephone. For these utilities, <br /> BKF will provide approximate relocation requirements to Caltrans, for coordination with the appropriate <br /> utility. <br /> Construction Detail Sheets will identify various elements of work which require additional detail or <br /> enlarged scales. <br />