My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
090710
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2010 2:22:22 PM
Creation date
9/2/2010 11:14:00 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/7/2010
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1: design of the Project. This information may be obtained from the City, Caltrans, utility companies, or <br /> other organizations. Data to be reviewed includes the following: <br /> B k F • Any previous report(s) or documents related to the proposed project area <br /> • As -built plans <br /> • Utility information <br /> • Survey control data <br /> • Right -of -way information including the Caltrans maps delineating access control limits <br /> • Materials Report, if available <br /> • Traffic Studies conducted in support of Project scope <br /> Encroachment Permit Application - BKF will prepare a Caltrans encroachment permit application for <br /> submission and processing. The permit will allow for BKF and its Project team to perform site visits and <br /> investigations required to establish the Project's existing conditions within the State right -of -way. <br /> Site Visits — BKF and its Project team will conduct frequent site visits to evaluate and document the <br /> existing project site conditions. <br /> Design Surveys and Survey Control Data — BKF will provide supplemental design surveying services for <br /> the Project. BKF will review the existing aerial base mapping and perform additional field surveys <br /> necessary to support the Project design. These surveys will include, but are not limited to cross sections, <br /> verifying utilities and drainage facilities, pavement elevations and locations, potholing, boring locations, <br /> conforms, vertical clearances, obstructions, trees, lighting fixtures, fences, retaining walls, drainage <br /> swales and ditches. <br /> Project Base Sheets — Project base sheets will be developed under this work task. It is assumed that <br /> existing aerial base mapping will be made available to the Project for use as design base sheets. The <br /> base sheets will be supplemented with the topographic field survey performed. The proposed work plan <br /> proposes to update project base sheets early in the design phase so that the base sheets may be used <br /> for the geometric development and environmental revalidation. In this manner, the preliminary <br /> geometric work performed is based on the most accurate information available and will minimize <br /> revisions in later phases <br /> Utility Verification — BKF will perform utility research and surveys to map the existing utilities in the <br /> Project area, positively locate utilities that potentially conflict with the proposed improvements and <br /> develop relocation plans for conflicting utilities. This level of effort will minimize construction costs and <br /> ensure the correct placement of the proposed improvements. BKF will: <br /> • Review and update as -built utility information for the Project area <br /> • Request utility mapping from all affected utility owners <br /> • Update base mapping with existing utility information <br /> • Submit utility maps to affected utility owners for verification <br /> • Identify potential utility conflicts <br /> Traffic Operations Analysis — As the dual westbound right turn improvement to the NB I -680 Bernal on- <br /> ramp intersection was recently evaluated in the traffic impact study for the Bernal Property (South Bay <br /> Development), much of the existing and background data to complete the operations analysis for a PEER <br /> will be readily available. In addition to the Bernal Property traffic impact study, the City has recently <br /> completed traffic counts at various locations, including the I- 680 /Bernal Interchange. <br /> The PEER will contain all of the typical elements of a traffic study, including traffic forecasts and traffic <br /> operations. Our recommended initial step on this Project would be to meet with Caltrans to explain the <br /> interchange reconfiguration request, the current operational issues, and our intended forecast <br />
The URL can be used to link to this page
Your browser does not support the video tag.