Laserfiche WebLink
BACKGROUND <br /> The subject project consists of the application of a slurry seal coating to approximately <br /> 1,250,000 square feet of the following thirty (30) City streets with latex emulsified <br /> asphalt with Type II black volcanic aggregate. Slurry sealing is used to extend the life of <br /> existing street pavements. This project is a combination of streets programmed under <br /> two CIP projects, 085004 and 095004. These two projects were reevaluated and <br /> combined as one project, and are included in the location list below. <br /> STREET NAME J BEGIN LOCATION END LOCATION CLASS L A <br /> REGENCY DR LYLEWOOD DR BELVEDERE CT R 1,680 61,316 <br /> REGENCY DR BELVEDERE CT MEDALLION CT R 2,340 86,150 <br /> REGENCY DR MEDALLION CT LYLEWOOD DR R 640 24,320 <br /> REGENCY DR LYLEWOOD DR PARAGON CIR R 1,760 66,880 <br /> ASHTON CT REGENCY DR END R 461 18,760 <br /> BELVEDERE CT REGENCY DR END R 407 17,300 <br /> MEDALLION CT REGENCY DR END R 524 20,803 <br /> MILLEFORD CT. REGENCY DR END R 509 20,471 <br /> DEVEREUX CT LYLEWOOD DR END R 392 18,136 <br /> BRIGGS CT LYLEWOOD DR END R 555 22,370 <br /> TAKENS CT LYLEWOOD DR END R 126 8,921 <br /> TUDOR CT PARAGON CIR END R 381 16,290 <br /> LYLEWOOD DR REGENCY DR PARAGON CIR R <br /> 2,391 84,074 <br /> PARAGON CIR LYLEWOOD DR REGENCY DR R 2,495 90,142 <br /> ARLOTTA PL LYLEWOOD DR END R 522 20,154 <br /> JORGENSEN LANE FOOTHILL DR LYLEWOOD RD R 400 13,636 <br /> TAWNY DR BERNAL AVE TOURIGA C <br /> 1,280 52,317 <br /> NORTON WAY TAWNY DR PALOMINO DR C 1,453 54,878 <br /> TOURIGA VINEYARD AVE CONCORD ST C <br /> 3,854 151,195 <br /> BRUCE DR. KAMP DR. PALMER DR. R 228 7,524 <br /> HEADWAY KAMP DR. PALMER DR. R 250 8,250 <br /> Page 2 of 4 <br />