My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
061510
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:59:05 PM
Creation date
6/10/2010 3:17:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/15/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility Timing Signature <br /> for review and approval. These measures shall include but not limited to: Implementation: <br /> A procedure for notifying the City of Pleasanton; Project Sponsor; for Date <br /> potential <br /> A plan for posting signs on -site pertaining to permitted pedestrian/bike bridge, <br /> construction days and hours, and complaint procedures, and City of Pleasanton. <br /> who to notify in the event of a problem; <br /> A listing of telephone numbers (during regular construction Endnote #5 applies. <br /> hours and off hours); <br /> The designation of an on -site construction complaint <br /> manager for the bridge project; <br /> Notification of neighbors within 300 feet of the bridge <br /> project construction area at least 30 days in advance of any <br /> pile- driving activities about the estimated duration of the <br /> activity; and a preconst; uction meeting shall be held with the <br /> job inspectors and the general contractor /on -site project <br /> manager to confirm that noise mitigation and practices <br /> (including construction hours, neighborhood notification, <br /> and posted signs, etc.) are completed. <br /> NO -3.1 Require project developers to implement construction best Verify that construction Verification: City of On going during <br /> management practices to reduce construction noise, including: best management Pleasanton Building construction. Signature <br /> practices to reduce and Safety Division <br /> a. Locate stationary construction equipment as far from construction noise are and Engineering Title <br /> implemented; field Division. <br /> adjacent occupied buildings as possible. inspections. Date <br /> b. Select routes for movement of construction- related vehicles Implementation: <br /> Project Developers. <br /> and equipment so that noise sensitive areas, including <br /> residences, and outdoor recreation areas, are avoided as Field inspections: City <br /> much as possible. Include these routes in materials of Pleasanton Building <br /> submitted to the City of Pleasanton for approval prior to the and Safety Division <br /> and Engineering <br /> issuance of building permits. Division. <br /> c. All site improvements and construction activities shall be <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.