Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility'' Timing Signature <br /> limited to the hours of 8:00 a.m. to 5:00 p.m., Monday <br /> through Saturday. In addition, no construction shall be <br /> allowed on State and federal holidays. If complaints are <br /> received regarding the Saturday construction hours, the <br /> Community Development Director may modify or revoke <br /> the Saturday construction hours. The Community <br /> Development Director may allow earlier "start- times" for <br /> specific construction activities (e.g., concrete- <br /> foundation/floor pouring), if it can be demonstrated to the <br /> satisfaction of the Community Development Director that <br /> the construction and construction traffic noise will not affect <br /> nearby residents. <br /> d. All construction equipment must meet DMV noise standards <br /> and shall be equipped with muffling devices. <br /> e. Designate a noise disturbance coordinator who will be <br /> responsible for responding to complaints about noise during <br /> construction. The telephone number of the noise <br /> disturbance coordinator shall be conspicuously posted at the <br /> construction site and shall be provided to the City of <br /> Pleasanton. Copies of the construction schedule shall also <br /> be posted at nearby noise sensitive areas. <br /> NO -4.1 Provide noise attenuating pavement to new portions of Stoneridge Verify that noise Verification: City of During <br /> Drive. The project sponsor shall be required to provide noise attenuation attenuating pavement is Pleasanton construction of Signature <br /> used for the new Engineering Division. Stoneridge Drive. <br /> on the new portions of Stoneridge Drive. Noise attenuation shall be portions of Stoneridge Title <br /> achieved with the implementation of open grade asphalt, which provides Drive; field inspections. Implementation: <br /> approximately a 3 dBA decrease in traffic noise level, in order to reduce Project Sponsor. Date <br /> the project's contribution to traffic noise in this area and to comply with <br /> the City's 60 dBA CNEL noise standard for residential land uses. <br /> Endnote #5 applies. <br /> 30 <br />