Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility'"' Timing Signature <br /> Ranch Site or the Stoneridge Drive Bridge, the Alameda County Surplus preservation of other easement: Prior to Title <br /> Property Authority (ACSPA) shall permanently preserve a minimum of habitat through a issuance of first <br /> conservation grading permit. Date <br /> 1.77 acres of San Joaquin spearscale habitat in Alameda County by either easement: <br /> purchasing 1.77 acres worth of credits from the Springtown Natural ACSPA Field inspections: <br /> Community Preserve in the City of Livermore or by permanently Prior to <br /> protecting 1.77 acres of other spearscale habitat in Alameda County Review of credits or commencement of <br /> conservation grading. <br /> through the use of a conservation easement or other similar method. easements: <br /> City of Pleasanton <br /> Engineering Division. <br /> BI0-4.1 Conduct Preconstruction Surveys for Western Pond Turtle. A Verify that a Contracting of Survey <br /> preconstruction survey for western pond turtle shall be conducted by a preconstrnction survey qualified biologist for construction area: Signature <br /> for westem pond turtle survey; notification to Within 3 days <br /> qualified biologist three days prior to the onset of bridge construction or was conducted; removal City of Pleasanton prior to bridge Title <br /> activities in the arroyo. The survey area shall be within the arroyo of western pond turtle Engineering Division construction or <br /> channel and shall encompass all areas within at least 100 feet of the by a qualified biologist if westem pond turtle activities within Date <br /> proposed area to be affected. If any western pond turtles are encountered if western pond turtle found; contracting of the Arroyo Mocho <br /> found; field inspections. qualified biologist for channel, or its <br /> during any project activities, construction shall cease until the turtle leaves removal of westem riparian <br /> the area or is removed by a qualified biologist and relocated to nearby pond turtle if western vegetation. <br /> suitable aquatic habitats. If no westem pond turtles are found, then no pond turtle found; <br /> further mitigation would be necessary. ceasing construction if Notification to <br /> western pond turtle City of Pleasanton <br /> found during Engineering <br /> construction: Division if <br /> Project Sponsor; for western pond <br /> potential turtle found during <br /> pedestrian/bike bridge, construction: <br /> City of Pleasanton. Immediately. <br /> Endnotes #5 and #6 Ceasing <br /> apply. construction if <br /> western pond <br /> turtle found during <br /> construction: <br /> I <br /> 11 <br />