Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN ]May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility'' Timing Signature <br /> Immediately. <br /> Review of Review of <br /> qualifications of qualifications of <br /> biologist and review biologist and <br /> of survey: survey: Prior to <br /> City of Pleasanton construction. <br /> Engineering Division. <br /> Field inspections if Field inspections: <br /> western pond turtle On -going during <br /> found: City of construction. <br /> Pleasanton <br /> Engineering Division. <br /> BIO -4.2 Provide Exclusion Fencing for Western Pond Turtle. If western Verify that if western Verification: Prior to <br /> 1 I pond turtles are determined to be present in the Arroyo Mocho, exclusion pond turtles are present City of Pleasanton construction Signature <br /> exclusion fencing is Engineering Division. activities if <br /> fencing shall be erected around active construction zones near the Arroyo erected; field western pond Title <br /> Mocho to prevent turtles from entering the site. inspections. Implementation: turtles are present. <br /> Project Sponsor; for Date <br /> potential <br /> pedestrian/bike bridge, <br /> City of Pleasanton. <br /> Endnotes 45 and 46 <br /> apply. <br /> Field inspections: <br /> City of Pleasanton <br /> Engineering Division. <br /> B 1O -5.1 Conduct nesting bird surveys. Prior to the beginning of tree If nesting bird survey Contracting of For activities <br /> removal or mass grading, between February 15 and August 15, including required, review qualified biologist: between February Signature <br /> qualifications of Each Project 15 and August 15: <br /> grading for major infrastructure improvements, an avian nesting survey biologist; review report Developer for its PUD prior to the Title <br /> shall be conducted of all habitat within 350 feet of any grading or <br /> 12 <br />