My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
061510
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:59:05 PM
Creation date
6/10/2010 3:17:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/15/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility" Timing Signature <br /> recommended by USFWS if CRLF construction: <br /> USFWS if CRLF monitor fmds that Immediately. <br /> monitor fmds that CRLF could be <br /> CRLF could be directly directly affected by Implement <br /> affected by project project construction: mitigation <br /> construction; field Project Sponsor; for measures <br /> inspections. potential recommended by <br /> pedestrian/bike bridge, USFWS if CRLF <br /> City of Pleasanton. monitor finds that <br /> CRLF could be <br /> Endnotes #5 and #6 directly affected <br /> apply. by project <br /> construction: <br /> Review of As recommended <br /> qualifications of by USFWS. <br /> biologist: <br /> City of Pleasanton <br /> Engineering Division. <br /> Field inspections: Field inspections: <br /> City of Pleasanton On -going during <br /> Engineering Division. construction. <br /> BIO -2.4 Conduct WEAP training. The Project Sponsor shall conduct Verify that WEAP Verification: The City Prior to <br /> Worker Environmental Awareness Program (WEAP) training for training of construction of Pleasanton construction Signature <br /> crews was conducted. Engineering Division. activities within <br /> construction crews (primarily crew and construction foreman) before the arroyo. Title <br /> construction activities within the arroyo begin. The WEAP shall include a Endnotes #5 and #6 <br /> brief review of the special status species and other sensitive resources that apply. Date <br /> could occur in the construction area (including their life history and <br /> habitat requirements and the portions of the Project Area where they may Implementation: <br /> Project Sponsor. <br /> be found) and their legal status and protection. <br /> S- BIO -I. Preserve off-site San Joaquin spearscale habitat. Prior to Verify that off -site Purchase of credits Purchase credits <br /> issuance of the first grading permit for all or a portion of the Staples habitat has been from Springtown or record Signature <br /> permanently preserved. Preserve or conservation <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.