My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
061510
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:59:05 PM
Creation date
6/10/2010 3:17:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/15/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN (May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility' Timing Signature <br /> dispersing or foraging CRLF, all construction activities within 100 feet of restrictions during the bridge and all <br /> Arroyo Mocho aquatic habitats, including construction of the Stoneridge construction; field construction activities Title <br /> inspections. to be constructed by it <br /> Drive bridge, shall be conducted during the dry season, between May 1 per the Stoneridge Date <br /> and October 15, or before the onset of the rainy season, whichever occurs Drive Specific Plan <br /> first unless exclusion fencing is utilized. Construction that commences in Amendment and the <br /> the dry season may continue into the rainy season if exclusion fencing is Development <br /> Agreement. <br /> placed between the construction site and Arroyo Mocho to keep the frog <br /> from entering the construction area. Endnotes #5 and #6 <br /> apply. <br /> Field inspections: <br /> City of Pleasanton <br /> Engineering Division. <br /> B10 -2.3 Conduct construction monitoring for CRLF. If preconstruction If monitoring is Contracting of Contracting of <br /> surveys identify CRLF in the Arroyo Mocho channel within the Project required, verify qualified biologist for qualified biologist Signature <br /> monitoring for the monitoring; ceasing for monitoring and <br /> Area, the Project Sponsor shall retain a qualified biologist to monitor for presence of CRLF construction and reviewing Title <br /> the presence of CRLF in the active construction area within Arroyo during construction; notifying USFWS and biologist's <br /> Mocho channel. If individual CRLF could be directly affected by project cease construction and City of Pleasanton I qualifications: Date <br /> construction, then these activities shall cease and the USFWS shall be notify USFWS if Engineering Division Prior to <br /> monitor finds that if CRLF monitor finds construction <br /> notified immediately. Formal consultation may then be required by the CRLF could be directly that CRLF could be activities. <br /> USFWS, and mitigation measures will be developed through the affected by project directly affected by <br /> consultation process to reduce impacts to the species. The Project Sponsor construction; project construction; Ceasing <br /> shall implement mitigation measures that are recommended by the notification of and consultation with construction and <br /> USFWS through the consultation process to reduce impacts to this consultation with USFWS, if required notify USFWS <br /> USFWS, if required by by USFWS, if CRLF and City of <br /> species. USFWS, if CRLF monitor finds that Pleasanton <br /> monitor finds that CRLF could be Engineering <br /> CRLF could be directly directly affected by Division if CRLF <br /> affected by project project construction; monitor finds that <br /> construction; implement mitigation CRLF could be <br /> implementation of measures directly affected <br /> mitigation measures recommended by by project <br />
The URL can be used to link to this page
Your browser does not support the video tag.