My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
061510
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:59:05 PM
Creation date
6/10/2010 3:17:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/15/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT /STAPLES RANCH PROJECT <br /> MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br /> Date Completed/ <br /> Mitigation Measures/Improvement Measures Monitoring Action Responsibility Timing Signature <br /> the Project Sponsor to conduct pre construction clearance surveys in the notification of US Fish Engineering Division construction or Date <br /> construction area for the CRLF no more than 48 hours before construction and Wildlife Service f CRLF found; activities within <br /> (USFWS) if CRLF contracting of the Arroyo Mocho <br /> activities begin. If no CRLF are determined to be in the impact area, then found; removal of qualified biologist for channel, or its <br /> no further mitigation would be necessary. If CRLF are encountered CRLF by a qualified removal of CRLF if riparian <br /> during any construction activities within suitable habitat, construction biologist if CRLF CRLF found; ceasing vegetation. <br /> shall cease and the USFWS shall be notified immediately. Before found; field inspections. construction if CRLF <br /> construction activities can restart, the CRLF shall be removed by a found dur ng Notification to <br /> construction: USFWS and City <br /> USFWS /CDFG- approved biologist and relocated to nearby suitable Project Sponsor; for of Pleasanton <br /> aquatic habitat. potential Engineering <br /> pedestrian/bike bridge, Division if CRLF <br /> City of Pleasanton. found during <br /> construction: <br /> Immediately. <br /> Endnotes #5 and #6 <br /> apply. I Ceasing <br /> construction if <br /> CRLF found <br /> during <br /> construction: <br /> Immediately. <br /> Review of Review of <br /> qualifications of qualifications of <br /> biologist and review biologist and <br /> of survey: survey: Prior to <br /> City of Pleasanton construction. <br /> Engineering Division. <br /> Field inspections if Field inspections: <br /> CRLF found: City of On -going during <br /> Pleasanton construction. <br /> Engineering Division. <br /> B10-2.2 Implement ground disturbance restrictions associated with Verify implementation Implementation; On -going during <br /> construction near the Arroyo Mocho. To minimize disturbance to of ground disturbance Project Sponsor for construction. Signature <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.