Laserfiche WebLink
Section 1 <br />Development of the Revenue Requirement <br />1.1 Introduction <br />This section of the report discusses the development of the City of Pleasanton's local sewer <br />revenue requirement analysis. The revenue requirement analysis is the first analytical step in the <br />local sewer rate study process. This analysis determines the adequacy of the City's overall local <br />sewer utility rates. From this analysis, a determination can be made as to the overall level of <br />local sewer rate adjustment needed to provide adequate and prudent funding for both operating <br />and capital needs. Typically, one of the main objectives of a sewer rate study is to develop "fair <br />and equitable" rates while attempting to minimize the impacts to the utility's customers. <br />City staff developed the basic revenue and expense projections which HDR reviewed and <br />analyzed to develop the revenue requirement for this study. In <br />reviewing the local sewer revenue requirement, it was assumed <br />that the utility must financially "stand on its own" and be properly <br />funded. As a result, the revenue requirement assume the full and <br />proper funding needed to operate and maintain the system on a <br />financially sound and prudent basis. A major focus of this section <br />of the report will be the funding of the near and long -term <br />maintenance of the local collection system. The capital <br />improvement plan is often the driving force in a utility's overall <br />funding needs, and that is the case for the City's local sewer utility. <br />Provided below is a detailed discussion of the development of Pleasanton's revenue requirement <br />analysis. <br />"The capital <br />improvement plan is <br />Olen the driving force in <br />a utility's overall <br />funding needs, and that <br />is the case for the City's <br />local sewer wilily." <br />1.2 Determining the Time Period and Method of <br />Accumulating Costs <br />The initial step for developing the revenue requirement for the City was to establish a "test <br />period or time frame of reference for the revenue requirement analysis. For this particular <br />study, the revenue requirement was developed for the projected eight -year time period of fiscal <br />year 2010 2017. By reviewing costs over an extended time period, the City can anticipate and <br />plan around any significant changes or needs in operating and capital requirements. By planning <br />around these anticipated needs, Pleasanton can minimize short-term rate impacts and overall <br />long -term rates. The City is currently developing an asset management plan for this utility which <br />considers their capital improvement and maintenance needs over a long -term time period. <br />Obviously, this study is not attempting to establish rates for this length of time period, but it is <br />important to understand the potential funding needs the City may have for asset management <br />needs over the next ten (10) to thirty (30) years. <br />TTT ^r Development of the Revenue Requirement t <br />City of Pleasanton Local Sewev Rate Study <br />